Infrastructure Security and Energy Restoration (ISER)

This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure.

Building Technologies Office

The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include 

  1. Emerging Technologies
  2. Residential Building
Structural and Architectural Engineering and Materials (SAEM)

SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures.

FY15 RCx

In FY15, the Retrocommissioning teams completed twelve buildings. 

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.

Project Updates

  • 12/20/2013

    As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours.

  • 10/15/2013

    As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours.