As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours.
You are here
Ceramics Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Infrastructure Security and Energy Restoration (ISER) |
This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. |
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
FY15 RCx |
In FY15, the Retrocommissioning teams completed twelve buildings. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Projects
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
12/20/2013
-
10/15/2013
As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours.