Members of the Zero Waste Team analyzed the main buildings in each of the three central quads. Locations of current 3-bins were noted as well as areas where more were needed.
You are here
Henry Administration Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
Intensive Longitudinal Analysis of Health Behaviors: Leveraging New Technologies to Understand Health Behaviors |
This program aims to provide funding to encourage research projects that seek to explain underlying mechanisms and predict health behaviors within individuals over time utilizing intensive longitudinal, within-person protocols that leverage recent advances in mobile and wireless sensor technologies and big data analytics. |
Mobile Monitoring of Cognitive Change |
This program invites applications to design and implement research infrastructure that will enable the monitoring of cognitive abilities and age, state, context, or health condition-related changes in cognitive abilities on mobile devices. |
Infrastructure Security and Energy Restoration (ISER) |
This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. |
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Solid Waste Management Grants |
This program reduces or eliminates pollution of water resources by providing funding for organizations that provide technical assistance or training to improve the planning and management of solid waste sites. |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
FY11 RCx |
In FY11, the Retrocommissioning teams completed eight buildings. The Facilities & Services Retrocommissioning Team at the University of Illinois received the 2011 Illinois Governor’s Sustainability Award at a ceremony on Thursday, October 27, 2011. Established in 1987, this award has been presented to both public and private organizations that have achieved significant progress on projects designed to protect the environment and improve sustainability within the State of Illinois. |
Waste Stream Characterization Study Phase 1 |
F&S has requested a proposal from the Illinois Sustainable Technology Center (ISTC) to get waste stream audits for select buildings across campus. The program will repeat the efforts completed by ISTC at their building, on a larger scale. This project could eventually extend to cover all campus facilities, or it could be done at select locations on a recurring basis to measure progress. |
LED Projects 2012 |
Several other LED replacement projects also took place in 2012. In the Krannert Art Museum Gallery (LINK Gallery) renovation, 62 LED fixtures were installed. Track lighting in the Henry Administration was replaced with LEDs. LEDs were also installed in the Illinois Sustainable Technology Center conference room. |
ICECF 2008 Lighting Retrofit |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
Projects
- Building Technologies Office
- Energy Conservation Incentive Program (ECIP)
- FY11 RCx
- ICECF 2008 Lighting Retrofit
- Indoor Bin Update
- Infrastructure Security and Energy Restoration (ISER)
- Intensive Longitudinal Analysis of Health Behaviors: Leveraging New Technologies to Understand Health Behaviors
- LED Projects 2012
- Mobile Monitoring of Cognitive Change
- Solid Waste Management Grants
- Structural and Architectural Engineering and Materials (SAEM)
- Waste Stream Characterization Study Phase 1
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
10/2/2024
-
1/5/2024
P10H08574 placed in the Materials Research Laboratory