You are here

North Campus Parking Deck (NCPD)

1201 West University Avenue
61801 Urbana , IL
United States
Illinois

This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.

Projects at this location

Project Description
Indoor Bin Update

This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency.

Solar Desalination

The Solar Desalination funding program will develop novel technologies or concepts using solar thermal energy to assist in creating freshwater from otherwise unusable waters. Thermal desalination is a potential solution to increase water supplies for municipal water and agriculture, and is an important technology to purify water produced from various industrial processes, including oil and gas production.

Full-Spectrum Optimized Conversion and Utilization of Sunlight (FOCUS)

FOCUS projects aim to enable cost-effective solar energy systems that offer the best of today's existing technologies: high-efficiency conversion of sunlight to electricity and stored, dispatchable energy from heat.

SUNSHOT Initiative

The SUNSHOT initiative is a national effort to support solar energy adoption by making solar energy affordable for all Americans through research and development efforts in collaboration with public and private partners.

Energy for Sustainability

The program supports fundamental engineering research that will enable innovative processes for the sustainable production of electricity and fuels, and for energy storage. These processes must be environmentally benign, reduce greenhouse gas production, and use renewable resources.

Install Solar PVs on NCPD

The goal of the ECE (Electrical and Computer Engineering Building project is to achieve Platinum LEED standards and be net zero for outside energy consumption.  To meet that goal, engineers have proposed the use of solar panels atop the ECE building to offset the building’s energy consumption. Complexities of building design have resulted in the building being unable to support a sufficient number of solar arrays to generate the energy required to offset the building’s energy consumption.

Parking Master Plan

The goal of the new Master Plan is to provide safe and accessible parking for the whole campus community – and since you’re part of that community, the changes will directly and indirectly benefit you!  The comprehensive planning process will include these steps:

  • Needs assessment, including use of existing parking spaces and campus-wide demand for parking

  • Parking alternatives analysis for the replacement of central campus garages C7 and C10