Status Update on Water006 Recommendation: Lot23 Monitoring

Posted by Quinn Connolly on December 1, 2022

On May 28, 2022 Meredith Moore sent an email to Arthur Schmidt regarding the status of the Water 006 recommendation:

Hi Art!

 

I hope you are well. I am reaching out to check in about the status of the Water006 recommendation: Lot23 Monitoring. This is an old recommendation that was returned back to the Water and Stormwater SWATeam in August 2019. It can be found here: https://icap.sustainability.illinois.edu/project-update/water006-lot-f23-monitoring-returned.  Based on the project update, a proposal for funding was to be submitted to the Student Sustainability Committee. Are you aware if this happened?

 

I look forward to hearing from you. Thanks!

 

Meredith

-----------

On November 30, 2022 Mrogan White sent the following to Arthurt Schmidt:

Hi Art,

Could you please answer these quick questions?

  1. Did you ever move forward with installing a monitoring system of any kind in the parking lot at Florida and Lincoln (Lot F23)?
  2. If the SSC would provide funding for such an installation, would you be able to serve as an advisor for the project and use the collected information?

Thanks!

Morgan

------------

On Dec 1, 2022 Art responded:

Hi, Morgan:

Many years ago when this first came up we installed an instrumentation vault at the SE corner of the lot where the storm sewer pipe leaves the lot.  We never received any funding to move forward with this, so no instrumentation ever installed.

 

I would be thrilled to help/advise with moving this forward.  I would also try to find portions of this where my Field Methods class could help install/calibrate/maintain instruments or collect samples.  I have a couple classes were we could use the data.

Art