WPP Building 1258 geothermal metering system installation request
Posted by Quinn Connolly on April 14, 2023
Good morning,
Here is what I found.
Al
--------------------
Hi Robbie,
Here are the engineering documents and pictures of the heat pumps. There are 5 heat pumps.
Andy
-------------------
Team,
Here's another geothermal system needing to be metered. It appears to need both ST, RT temperature RTD, and flow meter installation and tied into alpha controller and programming.
Thanks.
Robbie Bauer
----------------------------
Andrew,
The team surveyed it this week and a meter is planned to be installed shortly. I’ll keep you updated.
-----------------------------
Hi Yu-Feng,
Robbie Bauer from F&S is finishing the meter install on the last geothermal system on campus. So going forward we will have access to data from all the systems. At the very least, inlet and outlet temperature, flow rate, and energy going into the borefield will be collected. Robbie is interested in calculating the annual energy avoidance for each system.
Best,
Andy
----------------------
Thanks for the update.
Yu-Feng