1 Slim Bin placed at the Waste Transfer Station
P10H08575 placed in Waste Transfer Station break room
P10H08575 placed in Waste Transfer Station break room
P10H08574 placed in the Materials Research Laboratory
P10H08580 placed on the first floor- East
P10H08581 placed on the first floor- West
P10H08585 placed on basement level
P1H08584 placed on first floor
P10H08583 placed on second floor
P10H08582 placed on third floor
P10H08419 placed on Lower Level C0220 near stairs, P10H08418 placed on second floor C2220 against north brick wall, P10H08117 placed on third floor C3200 east wall/elevator landing, P10H08416 placed on fourth floor C4200 east wall/evelator landing.
P10H08422 placed on the second floor south side, P10H08421 placed on the third floor north side, and P10H08420 placed on the third floor south side.
P10G96450 placed in the cafe, 613, on the south wall near the TV monitor.
P10G96448 placed in the vestibule outside the bottom of the stairwell, C0192.
P10G96449 placed at C100A.
P10H08415 on first floor outside 137, near lecture hall.
P10H08424 outside of room 62 in the basement and P10H0843 in 163C area where the old cafe space used to be.
P10G96447 lower lobby against the west wall.
P10G96446 C108 hallway by stairs.
P10G96445 on first floor near Pennsylvania Ave entrance.
The following is an email sent by John Marlin on May 16, 2023:
As most of you know I am retired from campus and involved in other off campus conservation activities. I will no longer be overseeing the Burrill Hall native planting.
During the pandemic, maintenance at campus native plantings by volunteers was not allowed. This coupled with very dry conditions caused deterioration of several sites including the one at Burrill Hall. F&S bought the woodland wildflowers for the planting and the Entomology Department installed them and provided some maintenance in conjunction with some students.
Department head May Berenbaum has put together an effort to revitalize the planting and has some limited funding for some maintenance of the native plants. F&S plans to make some changes in part of the area and the path is to be restored. Daniel Bush will initially work with the native plants and supervise any students.
In the past weeds removed from the site were placed by the two square concrete benches and I notified Ryan Welch who had the maintenance crew remove them. I assume a similar arrangement can be made possibly with Mr. Dalby as the contact.
This site was quite popular with people walking past and provided a good instructional resource, especially the area near the sidewalk. I hope that this will continue.
John C. Marlin
Dennis Dalby replied:
Thank you John,
It was nice meeting you today to gain some of your tips and input regarding the planting and upkeep of this area. I’ve been working with Ryan Welch and SIB to get this area brought back up to its current level and look forward to its improved upkeep with the discussions that we had today. We’ll be working with Ryan to have a wood chip path added once again and will add a few small plants of our own within the areas that we (MCB) will maintain. SIB will maintain the areas of the native plants. It will look and function much better once all is in place.
Thanks again for stopping by to share your experience,
Dennis
P10G96444 placed near Room 364.
P10G96441 placed on ground floor, P10G96443 placed on second floor, P10G96442 placed on third floor.
On March 27, 2023, it was recorded that 63 buildings across campus have at least one of the new 3-bins.
P10H08409 north of main hallway and P10H08410 south of main hallway.
P10E62230 placed in the basement, P10H08411 placed on second floor, and P10H08412 placed on third floor.