Projects Updates for place: Davenport Hall

  1. Spurlock ECIP project

    Mike,

    As we discussed on the phone, our Electricians have visited with the folks at Spurlock and secured a preliminary scope of work (see attached). Because of the complex existing lighting system in the building our Electricians will require some assistance from our In-House Engineering staff. I understand that Spurlock has been allotted $22K for this work. I am going to ask Robert to give us an estimate of the Engineering charges and if they exceed 10% of the budget we will discuss scaling back some of the scope with the folks at Spurlock. The AiM project is 2693 and the Engineering estimate work order is 10282137.

    Thanks,

    Thomas Doud

    Construction Superintendent

    Construction Services Division

    University of Illinois, Facilities and Services

    217-244-3686

    Attached Files: 
  2. News about Christopher Hall winning

    Saving energy pays off for Christopher Hall

    Clayton Glazik 3/5/2014

    Since we were little our parents have told us to turn off the lights after we leave a room. That is just what the Christopher Hall residents at the University of Illinois did in 2013. By shutting the lights off in rooms not in use, switching their lights to compact fluorescent light (CFL) bulbs, as well as other sustainable practices, the building was able to cut back its energy usage by 30.6% from the previous year.

    The campus Facilities & Services (F&S) hosted a reception at Christopher Hall on February 14 to celebrate the building’s accomplishment in the F&S Energy Conservation Incentive Program (ECIP). A campus-wide sustainability effort, ECIP provides building upgrades to facilities that produce top energy conservation results in energy advancement and occupant action categories. ECIP calculates how much money the buildings are saving in energy reduction and gives it back to the building to pay for upgrades.

    Christopher Hall, which houses the Family Resiliency Center (FRC), the Autism Program (TAP), several classrooms, faculty and staff offices, and a family research home, saved nearly $22,000. According to FRC Director Barbara Fiese, a building committee recommended investing the funds in a bike rack since so many people cycle to work, as well as other items that can further reduce energy usage.

    In 2010, the University of Illinois published a climate action plan that set aggressive timeliness for reducing energy consumption on campus. Currently, there are more than 300 such active projects, which can be tracked at http://icap.sustainability.illinois.edu/projects.

    “At the end of the day, if we really want to meet ICAP goals, we have to do more,” says Al Stratman, F&S executive director. “That is why we came up with ECIP, which mirrors the campus goals.”

    At the award ceremony, faculty and students pledged to continue reducing energy in their lifestyles by taking public transportation, using natural light in their offices rather than electricity, and shopping more at local food markets instead of commercial grocery stores. With their current sustainable practices and these recent pledges, Christopher Hall will continue slashing their energy consumption, making the Illinois campus a greener place.

    (from Family Resiliency Center news http://illinois.edu/lb/article/3493/82438)

  3. News about Library winning

    Libraries Win Energy Awards

    Jan 23, 2014

    The Energy Conservation Incentive Program (ECIP) at Illinois awards building upgrades on campus in facilities which have produced top energy conservation results. Each year eight campus buildings receive ECIP awards in two separate categories. Those selected have demonstrated the greatest percentage of energy conservation over a one-year period.

    In 2013, three of eight awards went to Urbana campus libraries. The Undergraduate Library won 1st Place in the Occupant Action category; in the Energy Advancement category, the Main Library took 3rd Place while the Grainger Engineering Library took 4th Place. These libraries will work with the Utilities & Energy Services Division within Facilities & Services at the University to implement upgrades to their appearance or functionality.

    The Energy Advancement category is for campus buildings whose energy reduction is the result of central funding from a significant energy conservation project. The Occupant Action category is for those buildings which have not benefited from such projects in the last fiscal year.

    To learn more about the ECIP, please visit go.illinois.edu/ecip.

    (from Library News at http://www.library.illinois.edu/news/ECIP2013.html)

  4. FY13 ECIP Award Winners Announced

    Energy Advancement Category

    1. Atmospheric Sciences Building            53.3%
    2. Spurlock Museum                                      44.5%
    3. Main Library                                                 43.1%
    4. Grainger Engineering Libra                    41.3%

    Occupant Action Category

    1. Undergraduate Library                            35.2%
    2. Law Building                                                  35.1%
    3. Christopher Hall                                          30.6%
    4. Henry Administration Building             28.4%
  5. Explanation of calculations

    We take total energy usage by building (electricity, Steam, Nat Gas and Chilled Water) convert all of those to one common unit, MMBTU (million British Thermal Units) and after adjusting for the weather differences between years, compare each building's annual usage with the year before.  We then convert the change into a percentage and then rank all eligible buildings by percentage saved.  The top four in each category win first through fourth.     Having won in FY13 does not disqualify you from winning in the future.  The goal is to encourage individual contributions to saving energy.   Mike Marquissee

  6. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  7. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  8. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  9. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  10. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  11. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  12. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  13. Foreign Language Building

    Associated Project(s): 

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  14. Krannert Center for the Performing Arts

    Associated Project(s): 

    A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26  years.

  15. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  16. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.

  17. Henry Administration Building

    Associated Project(s): 

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  18. Armory

    Associated Project(s): 

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  19. Mumford Hall

    Associated Project(s): 

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.