7/7/2025This morning, Sarthak, Emily, and Max visited the seven shipping containers to check their progress, attach a padlock to each shipping container door, and put an identifying sticker on each shipping container. Each shipping container now also has...
-
6/9/2025Ventilation systems were installed in each of the seven shipping containers last week and electrical work is currently being done to add power to the shipping containers. There are also hooks installed to hang bikes on one side of the wall in...
-
6/9/2025Work order #11257249 was created for for the Sign Shop to create and install seven (7) 18'x24' metal signs to be installed on each of the seven shipping containers for bicycle storage. These containers are located between the Abbott Chilling...
-
5/22/2025Work order #11252549 for the Key Shop to make 7 long shackled weatherproof padlocks for the shipping containers for the bike storage was completed on 05/22/2025. This task cost $544.84.
-
5/14/2025Work order #11252549 was created for the Key Shop to make 7 long shackled weatherproof padlocks for the shipping containers for the bike storage.
-
4/4/2025This month, the Land and Water team had their monthly meeting on Friday, April 4, at 9:00 am on a Teams video call. Linked below is the meeting agenda with the meeting notes from what the team discussed. Additionally, a recording of the meeting is...
-
3/23/2025The University of Illinois Urbana-Champaign’s Rainwater Management Program showcases a future vision for the campus that emphasizes the importance of rainwater retention and replenishment. The goal is to transition from the traditional viewpoint of...
-
3/4/2025Work order #11210322 for the Labor Shop to remove the parking blocks on the south-west side of the parking lot E-28 for shipping containers delivery in the gravel lot between the Abbott Chilling Tower and the Personnel Building was completed on 2/3/...
-
1/31/2025Work order #11183778 for Construction Service Support for construction phase 8474 bike storage [campus] rock laydown area was closed on 1/31/2025. This task cost $28.14.
-
1/17/2025Work order #11210744 is for Transportation Demand Management to pay for bagging City of Champaign meters for the delivery of shipping containers. This work order was converted to purchase order #A435424 and was closed on 1/17/2025. This task...