You are here
Bikeway Conceptual Designs (Completed)
Recent Project Updates
No project updates found
Project Family
-
2014 Campus Bike Plan
- Bikeway Conceptual Designs
Associated Collections
Description
Related Files
Armory Ave Path 220 210 200 790(1).pdf
FAR Path 330.pdf
First Street 250.pdf
Florida Kirby 380 390.pdf
Fourth Street 260 440.pdf
Goodwin Ave 20.pdf
Gregory Drive 230.pdf
Hazelwood 580.pdf
Lincoln Ave 310 320 540 520 530.pdf
Lorado Taft 770 780.pdf
Main St Path 30 160.pdf
Mathews Ave Path 280 281.pdf
Oak St 460 370 360 470.pdf
Peabody Drive 350.pdf
Pennsylvania 300.pdf
Race St 400.pdf
Sixth Street 270.pdf
St Marys Road 410 420 430.pdf
Stadium Drive 340.pdf
University Ave 10 15.pdf
Project Team
-
Project Leader:
Holly Nelson
Dates
-
Completed July 1, 2012Completed by Holly Nelson
Themes
-
Primary Theme: