You are here

Digital Computer Laboratory

1304 West Springfield
61801 Urbana , IL
United States
Illinois

This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.

Projects at this location

Project Description
Indoor Bin Update

This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency.

Solar Desalination

The Solar Desalination funding program will develop novel technologies or concepts using solar thermal energy to assist in creating freshwater from otherwise unusable waters. Thermal desalination is a potential solution to increase water supplies for municipal water and agriculture, and is an important technology to purify water produced from various industrial processes, including oil and gas production.

Advanced Grid and Research Development

This program accelerates discovery and innovation in electric transmission and distribution technologies and create "next generation" devices, software, tools, and techniques to help modernize the electric grid. 

Infrastructure Security and Energy Restoration (ISER)

This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure.

Building Technologies Office

The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include 

  1. Emerging Technologies
  2. Residential Building
SUNSHOT Initiative

The SUNSHOT initiative is a national effort to support solar energy adoption by making solar energy affordable for all Americans through research and development efforts in collaboration with public and private partners.

Structural and Architectural Engineering and Materials (SAEM)

SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures.

FY11 RCx

In FY11, the Retrocommissioning teams completed eight buildings. The Facilities & Services Retrocommissioning Team at the University of Illinois received the 2011 Illinois Governor’s Sustainability Award at a ceremony on Thursday, October 27, 2011. Established in 1987, this award has been presented to both public and private organizations that have achieved significant progress on projects designed to protect the environment and improve sustainability within the State of Illinois.

ICECF 2009 Lighting Retrofit

The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17.

Rooftop Solar Potential

One potential method for acheiving the 2015 iCAP goal for on-campus solar is to retrofit existing campus buildings with rooftop solar.  The amount of sun shine on each roof, the viability of the building itself, and the funding mechanisms all need to be reviewed and resolved for this idea to be implemented.  The viability for each building includes approval from the Architectural Review Committee, agreement of the building occupant facility leaders, and structural and electrical viability for the building.  As of 2016, the financial payback for solar photovoltaics is not strong enough to ea