Art & Design Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
FY14 RCx |
In FY14, the Retrocommissioning teams completed ten buildings. |
LED Exit Signs |
As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025. |
Lighting Retrofit #5 [ARCHIVED] |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Green Roof on Art & Design Link Gallery |
The goal of the project was to construct a green roof on the Link Gallery, which is located between the school of Art and Design and the Krannert Art Museum. The project will be implemented mainly by students and faculty of the School of Art and Design. On top of reducing energy costs, it will also provide rainwater for the surrounding gardens. Facilities and Services and the Student Sustainability Committee funded the project. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
FY12 SSC Bike Parking Upgrades [ARCHIVED] |
In FY12, the Student Sustainability Committee approved $225,000 to upgrade a number of bike parking locations on campus. Facilities & Services is completing the work to upgrade these locations by the end of Summer 2013. |
Projects
Project Updates
-
6/16/2025See attached the presentation used for the 2025 ECIP Awards Celebration
-
11/18/2024These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.