These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.
You are here
Education Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Green Roof on Education Building |
There is a green roof on the Education Building, which was installed in 1964. |
FY17 RCx |
In FY17, the Retrocommissioning teams addressed deferred maintanence for the following buildings. |
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
FY12 SSC Bike Parking Upgrades |
In FY12, the Student Sustainability Committee approved $225,000 to upgrade a number of bike parking locations on campus. Facilities & Services is completing the work to upgrade these locations by the end of Summer 2013. |
Project Updates
-
11/18/2024
-
11/8/2024
Fabricated through our own mill shop. Cost to make two of these bins is attached.