You are here

English Building

608 South Wright Street
61801 Urbana , IL
United States
Illinois

This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.

Projects at this location

Project Description
Indoor Bin Update

This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency.

Infrastructure Security and Energy Restoration (ISER)

This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure.

Building Technologies Office

The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include 

  1. Emerging Technologies
  2. Residential Building
Structural and Architectural Engineering and Materials (SAEM)

SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures.

FY16 RCx

In FY16, the Retrocommissioning teams completed six buildings.  

Bee Campus USA

 

Thinking globally and acting locally, Bee Campus USA brings communities together to sustain pollinators by increasing the abundance of native plants, providing nest sites, and reducing the use of pesticides. Affiliates of Bee Campus USA, such as U of I, also work to inspire others to take steps to conserve native pollinators through education and outreach. 

ICECF 2008 Lighting Retrofit

The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13.

Energy Conservation Incentive Program (ECIP)

For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets.  The  academic departments are supplied with utilities through the campus administrative budget.  For these departments, an incentive program has been implemented to encourage these units to conserve energy.