Projects at this location

Project Description
Solar Desalination

The Solar Desalination funding program will develop novel technologies or concepts using solar thermal energy to assist in creating freshwater from otherwise unusable waters. Thermal desalination is a potential solution to increase water supplies for municipal water and agriculture, and is an important technology to purify water produced from various industrial processes, including oil and gas production.

Full-Spectrum Optimized Conversion and Utilization of Sunlight (FOCUS)

FOCUS projects aim to enable cost-effective solar energy systems that offer the best of today's existing technologies: high-efficiency conversion of sunlight to electricity and stored, dispatchable energy from heat.

SUNSHOT Initiative

The SUNSHOT initiative is a national effort to support solar energy adoption by making solar energy affordable for all Americans through research and development efforts in collaboration with public and private partners.

Energy for Sustainability

The program supports fundamental engineering research that will enable innovative processes for the sustainable production of electricity and fuels, and for energy storage. These processes must be environmentally benign, reduce greenhouse gas production, and use renewable resources.

Speech and Hearing Rooftop Solar PVs

The Student Sustainability Committee funded the design and installation of a small solar PV array on the Speech and Hearing Sciences Building. This particular location was chosen due to its viability, visibility, and location near the heart of campus.  The roof was found to be strong enough to hold a ballasted solar array, and a design was completed. That design is available here in PDF format and can be pursued, if desired.

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.