You are here
Temple Hoyne Buell Hall
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
FY14 RCx |
In FY14, the Retrocommissioning teams completed ten buildings. |
Provide Working Bikes for University Employees |
This project involves encouraging more bicycle uses for employees. Packages can be sent out and delivered through the use of a bicycle. Bicycles can also be used for hauling objects to specific locations with the help of special equipment built by the Campus Bike Center. Student and Staff employees will be involved in the process.
|
TBH Lighting Project |
Temple Hoyne Buell Hall (TBH), built in 1996, was constructed to allow natural light into most classroom, studio, and office spaces in the building. The building has no automatic lighting controls, however. In order to reduce energy use associated with lighting and cooling within the building, occupancy sensors, daylight sensors, and lighting timers will be installed. LED fixtures will be installed in a small part of the building and LED exit signs will replace the incandescent and fluorescent exit signs. |
Lighting Retrofit #5 [ARCHIVED] |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
Projects
Project Updates
-
6/16/2025See attached the presentation used for the 2025 ECIP Awards Celebration
-
11/18/2024These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.