You are here

Niharika Kishore is working on developing a rooftop solar RFP for design

Posted by Morgan White on June 22, 2016

Today, Morgan Johnston met with Niharika Kishore to discuss the rooftop solar iCAP objective.  Niharika is going to review the work already done, in the iSEE solar box folder, and draft a proposal for getting the engineering design work done for a set of building.  She will be working towards meeting the FY20 on campus generation goal of 12,500 MWh/year, and possibly additional installations for FY25.