  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Best and Final Offer (BAFO) received

    Associated Project(s): 

    The preferred vendor, as identified through the RFP evaluation process, was asked to submit a Best and Final Offer (BAFO). This item was received and the campus will finalize exact funding plan.

  2. Campus Bike Project Funding Agreement

  3. Funding Award and Acceptance Letter_ECE Solar

    The new Electrical and Computer Engineering building (New ECE building) will be operational starting the fall semester of 2014, and will be a unique green building on the University of Illinois campus. It is designed to be the most energy efficient engineering building in the world and is targeting LEED platinum certification, the highest rating for efficiency. With the full planned solar energy complement, the building is projected to achieve net zero energy status. The facility will be one of the two largest net-zero energy buildings in the United States. It will be a facility that supports all its own energy needs – on average over each year – leaving no carbon or fossil consumption footprint. Although the ECE building design itself is intended to achieve LEED Platinum certification, the energy objectives go far beyond this rating to true energy sustainability.

  4. Energy Shade Curtains PSL Greenhouses

    Energy shade curtains have many benefits for greenhouses including optimization of natural light reaching the crop canopy and reductions in heating inputs and electricity for cooling equipment and lighting. This is the 3rd phase of funding provided to the Plant Care Facility (Turner Hall Greenhouses) for curtain installation and programming, and 7 additional curtains were installed at a total cost of $71,000. Meters installed in rooms with and without curtains continue to track energy savings, and have shown an overall 50% heating use reduction, 30% electricity use reduction, and 30% water use reduction (for cooling) during fall and winter months.

  5. Student Farm Funding Agreement

  6. Campus Bike Parking Overhaul Phase 1_Funding Award and Acceptance

  7. Burrill and Morrill Rain Garden Spring 2012 Funding Award and Acceptance

  8. Main Library Steam Reduction Project Funding Award and Acceptance Letter

  9. Campus Revolving Loan Fund

  10. Anaerobic Digester progress

    Associated Project(s): 

    The scope for an anaerobic digester with a methane capture at the Beef and Sheep Facility on South Farms has been completed and the project will be opened for a Quality Based Selection of an appropriate engineering firm.

  11. 12 proposals for the Solar Farm

    Associated Project(s): 

    The Request for Proposal for a Solar Farm Public-Private Partnership on South Farms resulted in 12 proposals for the Solar Farm.  The technical evaluation committee worked on reviewing and scoring each proposal, and provided some clarification questions to the UI Purchasing contact person.  The committee will meet again in May to identify a preferred vendor.