We have replaced the bike repair stations at Campus Bike Center, Altgeld Hall, and in the parking lot C-9 at the intersection of Fifth and Daniels.
F&S created a design to install a new curb cut at the intersection of Main and Mathews. This design was sent to the City of Urbana for approval. Once approved by the City of Urbana, F&S will construct this curb cut in-house.
The bicycle repair station at Campus Bike Center was replaced with Saris Public repair station. The installation was completed on 6/26/2023
Stacey,
The air pumps are installed at both locations. I have attached a picture
James