You are here

Projects Updates for place: Illini Union Bookstore

  1. Art and Design Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,250 T-12 fixtures in the Art and Design Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 202,172 hours. The simple payback for this project is 3.47 years.

  2. Art East Annex- Studio 1

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 703 T-12 fixtures in the Art East Annex (Studio 1) were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 112,892 hours. The simple payback for this project is 3.47 years.

  3. Ceramics Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 531 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 96,045 hours. The simple payback for this project is 2.96 years.

  4. Geological Survey Laboratory

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 225 T-12 fixtures in the Geological Survey Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 44,856 hours. The simple payback for this project is 2.59 years.

  5. Garage/ Car Pool

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 445 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 70,200 hours. The simple payback for this project is 2.79 years.

  6. Mailing Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 218 T-12 fixtures in the Mailing Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 33,971 hours. The simple payback for this project is 2.4 years.

  7. Children's Research Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 725 T-12 fixtures in the Children's Research Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 115,133 hours. The simple payback for this project is 3.53 years.

  8. Police Training Institute

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 604 T-12 fixtures in the Police Training Institute were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 90,436 hours. The simple payback for this project is 3.73 years.

  9. Memorial Stadium

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 821T-12 fixtures in Memorial Stadium were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 173,934 hours. The simple payback for this project is 2.41 years.

  10. Central Receiving Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 573 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 107,680 hours. The simple payback for this project is 1.8 years.

  11. Atkins Tennis Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 185 T-12 fixtures in Atkins Tennis Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 3,886 hours. The simple payback for this project is 2.96 years.

  12. FSI Classroom/ Office Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 248 T-12 fixtures in the FSI Classroom/ Office Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 40,839 hours. The simple payback for this project is 1.08 years.

  13. FSI Fire Station

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 127 T-12 fixtures in the FSI Fire Station were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 20,183 hours. The simple payback for this project is 1.51 years.

  14. FSI Firemanship Training Facility

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 51 T-12 fixtures in the FSI Firemanship Training Facility were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 8,576 hours. The simple payback for this project is 3.28 years.

  15. FSI South Storage Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 10 T-12 fixtures in the FSI South Storage Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 1,139 hours. The simple payback for this project is 12.71 years.

  16. FSI Storage Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 26 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 3,048 hours. The simple payback for this project is 18.86 years.

  17. FSI Hazmat Storage Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 20 T-12 fixtures in the FSI Hazmat Storage Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 2,278 hours. The simple payback for this project is 6.64 years.

  18. Main Library (Remainder)

    Associated Project(s): 

    As part of the Lighting Retrofit #5, the remaining 5,646 T-12 fixtures in the Main Library were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 849,998 hours. The simple payback for this project is 3.11 years.

  19. Natural Resources Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 2,711 T-12 fixtures in the Natural Resources Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 424,466 hours. The simple payback for this project is 2.2 years.

  20. IUB Retrocommissioning and Occupancy Sensors Loan

    Program Background:

    The Student Sustainability Committee (SSC) is tasked with the allocation of the proceeds of two student environmental fees – the Clean Energy Technology Fee and the Sustainable Campus Environment Fee, to improve the sustainability of our campus. The committee has established a program to make funds available for efficiency projects that will be later returned for reinvestment in future projects.

    Committee funds will be made available to the Office of Sustainability which will carry out an inter-departmental transfer to the Receiving campus unit. The Receiving unit agrees to return the transfer to the Office of Sustainability, in installments, as described on the next page, for reuse by the SSC.

    Project Description:            

    The Illini Union seeks funding to retro-commission the Illini Union Bookstore building, and to install Occupancy Sensors in the Illini Union building. The Illini Union Bookstore building contains both academic and auxiliary units, and the SSC loan will allow for complete retro-commissioning of the building. Retro-commissioning is expected to cost $113,000; the RCx process identifies defective components within the HVAC systems, reconfiguring and controlling them to function more efficiently, decreasing wear and tear and extending their service life by 20 years (as part of a regular preventative maintenance program), as well as reducing building energy consumption.

    The SSC loan will also provide $67,000 to install lighting occupancy sensors in the Illini Union, in food service preparation areas, restrooms, office areas and meeting rooms, which will reduce energy and lighting use.

    Terms:

    The Student Sustainability Committee is in favor of the Office of Sustainability transferring an amount of $180,000 to the Illini Union completion of this work. These funds are to be drawn from the Sustainable Campus Environment Fee account managed by the SSC, as needed to complete the project. All funds requested from the SSC must be expended before 30th September 2010, else the unit must apply for an extension.

    The Illini Union agrees to return the funds provided by carrying out annual transfers to the Office of Sustainability due on the 15th of August of each year in the following manner:

    $20,000 – Due 15th August 2011

    $40,000 – Due 15th August 2012

    $40,000 – Due 15th August 2013

    $40,000 – Due 15th August 2014

    $40,000 – Due 15th August 2015

    The Office of Sustainability will direct them back to the Committee’s account. The Illini Union will provide a close-out report about the project after installation. The Illini Union will also appropriately publicize the Committee’s support of these projects.

    All funds provided by this transfer will be used in a manner consistent with University of Illinois policies and procedures.

Pages