Projects Updates for place: Illini Union Bookstore

  1. Meeting with iSEE and F&S

    Associated Project(s): 

    Project advocates met with representatives of iSEE and F&S to discuss the SmartWay program.  Additional follow up information was shared from Professor Lavey.

  2. Printing and Photographic Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours. The simple payback for this project is 3.15 years.

  3. Notice to selected buildings

    From: "Rients, Seth M" <rients@illinois.edu> Date: November 4, 2013 at 2:13:15 PM  Cc: "Johnston, Morgan B" <mbjohnst@illinois.edu>, "Osby, Tracy L" <tosby@illinois.edu>, "Jacobson, Debra F" <djacobso@illinois.edu> Subject: Building Waste Stream Characterization                   I am pleased to announce that your building has been selected by Facilities and Services to be one of the four buildings in a pilot waste stream characterization study for the University of Illinois at Urbana-Champaign. This study is designed in support of the campus wide Zero Waste policy which aims to increase the waste diversion rate to 75% by the year 2020. Facilities and Services has partnered with the Illinois Sustainable Technology Center (ISTC), a unit of the Prairie Research Institute at U of I, to perform this waste stream characterization study.                   ISTC will begin examining solid waste outflows from your building during the week of November 11th, for a period of one week. During this time all discarded materials from your building will be collected, sorted, weighed, and documented in an effort to create a baseline measurement for waste diversion activities. The first step in this process is to have a kickoff meeting at your facility so we can discuss in person any thoughts, cares, concerns, or questions that you may have. We would like to schedule a meeting for this Thursday, November 7th at 2 pm. This meeting shouldn’t last more than 30 minutes. Attached to this sheet you will find some questions and answers that have been previously asked of ISTC.   Thank you for your time,   Seth Rients, PSM Project Manager for the University of Illinois at Urbana-Champaign waste characterization study Illinois Sustainable Technology Center (217) – 300 – 4494  

  4. Agriculture Bioprocess Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours. The simple payback for this project is 3.62 years.

  5. IMEC Tracking Presentation

    Morgan Johnston met with Seth Rients and Luis Rodriguez to hear a presentation about the IMEC waste tracking system.  The system could be installed on campus dumpsters, along with corresponding scales on the garbage and recycling trucks.  This would be an automated data collection method for tracking the waste stream inputs at a macro level.

  6. Meeting about waste stream audits

    Seth Rients and Morgan Johnston met to review the scope of the work requested by F&S.  Seth noted that it would be great to have scales in trucks and a system for tracking where the waste materials are generated.  They also discussed the methodology details.  Where could the waste be sorted and weighed for each building?  Can each dumpster be collected individually during the week or two of the audit for that location and driven to the sorting site?  What level of sorting do we need to meet our plans?

  7. Animal Sciences A/C Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 50 T-12 fixtures in the Animal Sciences A/C Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 7,884  hours. The simple payback for this project is 3.56 years.

  8. University Press

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 488 T-12 fixtures in the University Press Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 76,948 hours. The simple payback for this project is 3.64 years.

  9. Transportation Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 547 T-12 fixtures in the Transportation Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 86,251 hours. The simple payback for this project is 3.56 years.

  10. Temple Hoyne Buell Hall

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 471 T-12 fixtures in Temple Hoyne Buell Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,267 hours. The simple payback for this project is 3.56 years.

  11. Speech and Hearing Clinic

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 47- T-12 fixtures in the Speech and Hearing Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,110 hours. The simple payback for this project is 3.08 years.

  12. Shelford Vivarium Greenhouse

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 335 T-12 fixtures in the Shelford Vivarium Greenhouse were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 52,823 hours. The simple payback for this project is 3.53 years.

  13. Personnel Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 433 T-12 fixtures in the Personnel Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,275 hours. The simple payback for this project is 3.2 years.

  14. Nuclear Physics Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 415 T-12 fixtures in the Nuclear Physics Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 65,437 hours. The simple payback for this project is 3.56 years.

  15. Natural Resources Studies Annex

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,200 T-12 fixtures in the Natural Resources Studies Annex were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 189,216 hours. The simple payback for this project is 3.56 years.

  16. Levis Faculty Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 189 T-12 fixtures in the Levis Faculty Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 29,802 hours. The simple payback for this project is 3.56 years.

  17. International Studies Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 571 T-12 fixtures in the International Studies Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 90,035 hours. The simple payback for this project is 3.56 years.