You are here
Projects Updates for Maintain and Improve Bicycle Network
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
Work Order Closed for Design of Curb Cut on Main & Mathews
Associated Project(s):Work order #11081274 for Engineering Services to design an ADA compliant curb cut for bicycles traveling east-west at the intersection of Main & Mathews was completed on 11/16/2023 and closed on 12/15/2023. This task cost $870.25.
Three bike repair stations replaced
Associated Project(s):We have replaced the bike repair stations at Campus Bike Center, Altgeld Hall, and in the parking lot C-9 at the intersection of Fifth and Daniels.
Design for the Curb cut at Main and Mathews
Associated Project(s):F&S created a design to install a new curb cut at the intersection of Main and Mathews. This design was sent to the City of Urbana for approval. Once approved by the City of Urbana, F&S will construct this curb cut in-house.
Attached Files:Bicycle Repair Station installed at Campus Bike Center
Associated Project(s):The bicycle repair station at Campus Bike Center was replaced with Saris Public repair station. The installation was completed on 6/26/2023
Attached Files:Work Order Created for Design of Curb Cut on Main & Mathews
Associated Project(s):Work order #11081274 created for Engineering Services to design an ADA compliant curb cut for bicycles traveling east-west at the intersection of Main & Mathews.
Work Order Created for Construction of Curb Cut on Main & Mathews
Associated Project(s):Work order #11060446 created for the labor shop and cement finishers to improve the curb cut at the intersection of Main and Mathews.
Bike Fix-It Stations
Associated Project(s):Stacey,
The air pumps are installed at both locations. I have attached a picture
JamesAttached Files: