Projects at this location

Project Description
FY08 RCx

Retrocommissioning (RCx) was formed in August 2007, under F&S management.  The program was formed to help alleviate existing utility deficits, anticipated increases in fuel costs for natural gas and coal, and major maintenance issues.  F&S decided to create this special team called RCx to go through these buildings to do as much maintenance as possible within the resources available and improve the air quality as much as possible.  This year, they used the motto "saving the planet one building at a time."

Krannert Great Hall Lighting Retrofit

The replacement of incandescent lighting in the audience chambers of each of the three major performance spaces in KCPA has a threefold purpose. Its primary purpose is to remove from service incandescent lighting that has been in place for nearly 50 years and is very energy inefficient. Beyond the energy efficiency issue is the efficiency of personnel who maintain the facility because of 1,500 light bulbs in question that have to be changed frequently, plus the safety issues involved in accessing many of the ceilings that are 35 to 56 feet above the floor.

Measure Waste Levels in Dumpsters [ARCHIVED]

Facilities & Services Waste Management handles trash and recycling pick-up for the majority of campus facilities.  The exterior garbage and recycling dumpsters are emptied on a regular schedule, by campus drivers working for the Waste Transfer Station. 

F&S is implementing a six month pilot program to install monitoring sensors on the lift arms of one waste hauling truck.

 

KCPA Lobby Lighting

The 550 lighting fixtures in the lobby of the Krannert Center for the Performing Arts were replaced with energy efficient LED fixtures in 2010. The new fixtures are projected to use 132,000 kilowatt-hours and cost $12,500 annually. This cost is about a fifth of the old system’s cost. The newer fixtures also lower cooling and maintenance costs. Another aspect of the installation is a computerized mixing feature that allows Krannert staff to change of the lighting color of each bulb to create a unique atmosphere in the building.

ICECF 2008 Lighting Retrofit [ARCHIVED]

The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13.

Green Roof on KCPA

A pilot green roof plot was proposed to be installed at the Krannert Center for the Performing Artis. This would be a 960 square foot installation that would be of much lower cost and have much lower maintenance requirements as compared to the University's first installation at the Business Instructional Facility.The project levered significant external funding and helped Krannert effectively fundraise for the installation.

Energy Conservation Incentive Program (ECIP)

For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets.  The  academic departments are supplied with utilities through the campus administrative budget.  For these departments, an incentive program has been implemented to encourage these units to conserve energy. 

KCPA Rooftop Solar Feasibility Study [ARCHIVED]

This feasibility study considered the potential placement of a Photovoltaic array on the roof of Krannert Center for the Performing Arts (KCPA). The Study was conducted in two phases. A construction budget of five hundred eighty-five thousand dollars ($585,000), excluding contingencies, was proposed by the Student Sustainability Committee.