You are here

Projects Updates for place: Foellinger Auditorium

  1. Energy presentation at Undergrad Library

    Associated Project(s): 

    Prior to the first Energy Liaison on-site presentation, Andy met with the two library staff that will be staffing the booth and talked about content and logistics. They selected a great location, just inside the West entrance to the Upper Level with a prime display location. They also pulled a book display which relates to energy and sustainability for the Lower Level. They are excited about the display and already have talked about moving it around their organization to continue to promote conservation! The date and time for the display is 10-2 on October 29 in the Undergrad Library.

    Attached Files: 
  2. LED Exit Signs Phase 2

    Associated Project(s): 

    Phase 2 of the LED Exit Sign project to replace incandescent exit signage with LED fixtures started on June 30, 2008. This phase of the project will replace fixtures in the Armory, Foellinger Auditorium, Harding Band Building, Illini Hall, the Optical Physics Building, the Illinois Program for Research & Humanities, the Architecture Building, Noble Hall, the Art & Design Building, the Music Building, Flagg Hall, and University High School.

  3. LED Exit Signs Phase 1

    Associated Project(s): 

    Phase 1 of the LED Exit Sign project will replace incandescent exit signage with LED fixtures in facilities used for the Engineering Open House. The building involved are the Material Sciences and Engineering Building,  the Mechanical Engineering Building, the Transportation Building, Altgeld Hall, Morrill Hall, Burrill Hall, Noyes Laboratory, and the Undergraduate Library.

Pages