You are here

Projects Updates for place: Animal Sciences Laboratory

  1. Freezer Challenge update and encouraged to register

    Associated Project(s): 
     
    Click here to see this online
     
     
     
     


    Hello everyone and Thank You to the many labs already registered!

    The International Freezer Challenge is in full swing with an EXTENDED deadline thru JUNE 15th. 
    Approximately 25 labs have registered to participate in the Freezer Challenge. Reaching our goal of 50 labs participating will put the university in contention for first place in the academic organization category. Regardless, participation represents your commitment to environmental stewardship and supports the University of Illinois in reflecting our world-class standing.

       All actions taken during the past school year are

    ...Expand »
  2. Freezer Challenge reminder email

    Associated Project(s): 

    Hello everyone, The International Freezer Challenge is in full swing thru April 30th. Help the University of Illinois compete while receiving recognition, and a certificate of leadership in Environmental Stewardship.
    Registering to participate in the Freezer Challenge is a fun way to stay up-to-date with the latest in sample management, receive recognition for your efforts, and have fun while helping the University of Illinois maintain our world-class standing.
    Take 20 sec's Register today!
    All lab practices since May 2017 are eligible for points and can be added to your score card.

    Benefits Webinars, Best Practices and Resources

    • Reducing energy consumption, costs, and environmental impact of the lab
    • Learning and applying proper cold
    • ...Expand »
  3. Freezer Challenge, 2018 International- Launch email

    Associated Project(s): 
     
     

    U of I Campus Labs Encouraged to Join
    2018 International Freezer Challenge


    Members of iSEE’s Energy Conservation & Building Standards Sustainability Working Advisory Team (ECBS SWATeam) invite U of I labs of all shapes and sizes to register for the International Laboratory Freezer Challenge, which uses friendly competition to optimize sustainability of freezer management in laboratories.

    Any type of laboratory is eligible to participate by working at its own pace to implement optimal cold storage management practices that save energy. Participating labs from the Illinois campus will receive certificates of Leadership and

    ...Expand »
  4. Freezer Challenge launching January 15, 2017

    ...Expand »

    U of I Campus Labs Encouraged to Join Freezer Challenge

    Members of iSEE’s Energy Conservation & Building Standards Sustainability Working Advisory Team (ECBS SWATeam) invites U. of I. labs of all shapes and sizes laboratories on campus to register for the North American Laboratory Freezer Challenge, which uses friendly competition to optimize sustainability of freezer management in laboratories.

    Any type of laboratory is eligible to participate by working at its own pace to implement optimal cold storage management practices that save energy. Participating labs from the Illinois campus will receive special recognition from iSEE at the annual Sustainability Week Celebration and

  5. Agriculture Bioprocess Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours. The simple payback for this project is 3.62 years.

  6. Animal Sciences A/C Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 50 T-12 fixtures in the Animal Sciences A/C Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 7,884  hours. The simple payback for this project is 3.56 years.

  7. University Press

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 488 T-12 fixtures in the University Press Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 76,948 hours. The simple payback for this project is 3.64 years.

  8. Transportation Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 547 T-12 fixtures in the Transportation Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 86,251 hours. The simple payback for this project is 3.56 years.

  9. Temple Hoyne Buell Hall

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 471 T-12 fixtures in Temple Hoyne Buell Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,267 hours. The simple payback for this project is 3.56 years.

  10. Speech and Hearing Clinic

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 47- T-12 fixtures in the Speech and Hearing Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 74,110 hours. The simple payback for this project is 3.08 years.

  11. Shelford Vivarium Greenhouse

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 335 T-12 fixtures in the Shelford Vivarium Greenhouse were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 52,823 hours. The simple payback for this project is 3.53 years.

  12. Personnel Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 433 T-12 fixtures in the Personnel Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,275 hours. The simple payback for this project is 3.2 years.

  13. Nuclear Physics Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 415 T-12 fixtures in the Nuclear Physics Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 65,437 hours. The simple payback for this project is 3.56 years.

  14. Natural Resources Studies Annex

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,200 T-12 fixtures in the Natural Resources Studies Annex were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 189,216 hours. The simple payback for this project is 3.56 years.

  15. Levis Faculty Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 189 T-12 fixtures in the Levis Faculty Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 29,802 hours. The simple payback for this project is 3.56 years.

  16. International Studies Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 571 T-12 fixtures in the International Studies Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 90,035 hours. The simple payback for this project is 3.56 years.

  17. Illini Hall

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 610 T-12 fixtures in Illini Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 96,185 hours. The simple payback for this project is 3.56 years.

Pages