  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. New Team Member

    Associated Project(s): 

    On 8/20, Frida and Sarthak virtually met Chinmayee Vaidya, a new team member joining the Bike Audit project. Chinmayee is a second-year Master of Urban Planning. During the meeting, Sarthak explained in detail about the project and explained Chinmayee's responsibilities and expected contributions in the project. The team also agreed to hold weekly meetings to discuss the project progress and determine next steps. 

  2. Perception-based Survey and Survey Block Map

    Associated Project(s): 

    From 8/3 to 8/7, Frida revised the survey block map and perception-based survey questions based on the discussion with Sarthak and Emma, and then updated them to Survey123 app.  

    The survey block map is attached. It has 63 blocks and is divided into three zones according to CATS. Zone 1 represents the highest priority of data collection while Zone 3 represents the lowest priority. 

    The perception-based survey has 34 questions which consists of three question types: single select, multiple select, and Likert scale. The survey has seven structures as follows: 

    1. Surveyor Information
    2. Survey Typology
    3. Safety
    4. Path Quality
    5. Bicyclists Behavior
    6. Safety Perception
    7. Overall Quality
  3. Survey Block Map

    Associated Project(s): 

    From 7/29 to 7/31, Frida continued working on the report by completing sections for which sufficient information was available. Additionally, Frida discussed the survey block map with Sarthak and Emma to determine which blocks were necessary to observe and which could be excluded from the data collection process.

  4. Report Drafting

    Associated Project(s): 

    From 7/21 to 7/24, Frida drafted the initial report, covering the report outline, project introduction (including the project background, goals and objectives, and scope), literature review on the importance of bicycling on campus, and a description of the study area (University of Illinois Urbana-Champaign). 

  5. Perception-based Survey Development

    Associated Project(s): 

    From 6/29 to 7/2, Frida added pictures to the perception-based survey to provide additional context and support informed decision-making during data collection. Additionally, Frida created a survey block map to divide the campus area into manageable data collection areas and identify priority and non-priority blocks to guide the analysis of collected data.

  6. Perception-based Survey Development

    Associated Project(s): 

    From 6/22 to 6/26, Frida revised the perception-based survey questions based on the feedback from Sarthak and Emma. She also reorganized the questions based on an academic journal she found. After finalizing the questions, Frida transferred the questions to the Survey123 application, making the survey accessible on mobile devices.

    Next, Frida developed scoring system for perception-based survey to calculate the Bikeability Index (BI). The scoring system assigns a maximum score of 3 or 5 and minimum score of -5, 0, or 1 to each question. Each question was also assigned a high, medium, and low priority based on its urgency and relevance to bicycling perception.

  7. Perception-based Survey Development

    Associated Project(s): 

    From 6/15 to 6/18, Frida created questions for the perception-based survey. She also asked Sarthak (Sustainable Transportation Assistant) and Emma (Sustainable Transportation Intern) to review the questions. 

  8. Project Development

    Associated Project(s): 

    From 6/10 to 6/12, Frida (a team member and a Master of Urban Planning student) started the Bike Audit project. She conducted preliminary research, including reviewing the 2022 Walkability Audit project, reading relevant literatures related to bicycle, and defining the project's goals and objectives.