You are here

All Project Updates

Search

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.


Pages

  1. Art and Design Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,250 T-12 fixtures in the Art and Design Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 202,172 hours. The simple payback for this project is 3.47 years.

  2. Funding request submitted to SSC for FY13

    Associated Project(s): 

    In February 2012, The Bike Project submitted a funding request to SSC for $39,872.  In March 2012, the SSC approved this funding. 

    During summer 2012, the University and The Bike Project revised their Facility Use Agreement to clarify their collaborative working relationship.  The SSC sent a clarification letter regarding this update and subsequently completed a revised award letter.

  3. payments to RSOs

    From: Hanson, Claudine
    Sent: Thursday, September 20, 2012 10:10 AM
    To: Johnston, Morgan B; Beverage, McKenzie
    Cc: Jones, John D
    Subject: RE: RSO Weatherization Payments

    Here you go.

    The full CFOAP for deposits into an RSO fund is  1-90xxxx-389005-307900-199000

    The fund numbers are as follows:

    Hong Kong Student Association     901645

    Chinese Undergraduate Student Association    902108

    Horticulture Club     901887

    Students for Environmental Concerns   901758

    American Society of Civil Engineers   901270

    Let me know if you have questions.

    Claudine

     

  4. Cost estimates requested for first 5 locations

    Associated Project(s): 

    Transportation staff submitted work order requests to have cost estimates for time and materials for the first five locations to be upgraded from donut hole bike parking to U-rack bike parking.  The remaining nine locations need to have CAD drawings produced and apprroved before costs can be estimated.  

  5. Art East Annex- Studio 1

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 703 T-12 fixtures in the Art East Annex (Studio 1) were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 112,892 hours. The simple payback for this project is 3.47 years.

  6. Status Update meeting with Mike Lyon

    Associated Project(s): 

    Amelia, Morgan, and Mike Lyon met this morning to review the current status of this project.  Morgan gave an overview of what has happened with bicycling this summer, and Amelia described the LINC class projects for this fall.  We will set a meeting with Risk Management, Legal, and Kinesiology to review the departmental bike sharing process.  We will also set a meeting with Purchasing to identify the correct process for the purchase of UI owned bicycles.

  7. BAFO will remain in effect until end of calendar year

    Associated Project(s): 

    Within the RFP, we requested that any offer be valid for 120 days. However, this project will most likely go to the Board of Trustees in November, which would be beyond the 120 day period. Therefore, Kim Porter requested an extension from the Preferred Vendor, and they have agreed to hold the offer firm until the end of this calendar year (2012).

    Specifically, the vendor said "Yes, we can honor our price through the end of the year. We’d be happy to become more engaged in the planning process with the University if appropriate. Please let me know if there is anything we could do."

  8. Ceramics Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 531 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 96,045 hours. The simple payback for this project is 2.96 years.

  9. Geological Survey Laboratory

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 225 T-12 fixtures in the Geological Survey Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 44,856 hours. The simple payback for this project is 2.59 years.

  10. F&S meeting with SSC re: Solar Farm

    Associated Project(s): 

    Jack Dempsey and Morgan Johnston from F&S met with Marika Nell (chair) and Mckenzie Beverage (program advisor) from the Student Sustainability Committee (SSC). This meeting was to give an overview of the Solar Farm project, and the anticipated funding needs.

  11. 14 Weeks Without Coal Burning

    Beginning on June 1, 2012 the University quit burning coal as the campus energy needs declined with the beginning of summer. The University had gone without coal for 20 weeks in the summer of 2011. Abbott Power Plant began burning coal again on September 5, 2012 after 14 weeks without burning.

  12. Update from Mark Barcus

    From: Barcus, Mark A
    Sent: Friday, August 31, 2012 7:58 AM
    To: Beverage, McKenzie; Johnston, Morgan B; Thomas Ferrarell (tjferrarell@gmail.com)
    Subject: RE: Weatherization Update

    Hello All,

    The work on these buildings should start in the next couple weeks. The Craft & Trades are getting past their busy season since school has started.

    The only item I see on Tom’s list that may be an issue is the tuck pointing at the Native American House 1206 W. Nevada. I will have to speak with our Brickmasons Foreman to see if this can be done.

    As for the Speech Communication building let me see what the future plans for its use are.

    Thanks

    Mark

  13. Update from Mckenzie Beverage

    Hi Mark and Morgan,

    I met with Thomas today and we discussed the kits and email to be sent to the buildings. He is waiting on confirmation from Mark for the building upgrades. Do you know when those will begin? He would like to list the specific upgrades that will be made for each building when he contacts them. I have attached his list here. Please let him know if all of these will be able to happen and when.

    Additionally, Thomas was informed that the Speech Communications building is not occupied this semester. Do you know how long it will be unoccupied? If it is longer than the fall semester, Thomas suggested reconsidering completing the upgrades.

    Let me know if you would like to set up a meeting to discuss these items. Otherwise, Thomas will be needing the energy usage information from before and after the upgrades to include that in his final report. Thanks!  

    Best Regards,

    Mckenzie Beverage

  14. $250,000 available in FY13; allocation process TBD

    Associated Project(s): 

    Mike Marquissee confirmed the funding available for allocation in FY13 is $250,000. Doris Reeser stated that there will be no AFMFA allocation meeting this year.  It was decided that the call for proposals should wait until there is at least $1M to allocate from this fund.  Therefore, there will not be a selection process during FY13.

  15. Garage/ Car Pool

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 445 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 70,200 hours. The simple payback for this project is 2.79 years.

Pages