You are here

All Project Updates

Search

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.


Pages

  1. Bicycle Facilities and Programs Projects Continue

    Associated Project(s): 

    Student intern met with employees at Christopher Hall to make recommendations for new bike parking.

    Submitted additional information about bike parking to the SSC, and were granted an award for $250,000 to revamp existing bike parking areas at various key locations throughout campus.

    Campus Transportation Committee met and reviewed all bike related iCAP projects. 

    Bike sharing survey went live from the LINC course, as described above.

    Staff met with employees at the Arboretum to make recommendations for new bike parking near the parking lot between the Idea Garden and the Japan House.

    Staff met with Housing representatives to discuss a potential pilot trial of distributed bike parking enforcement.  This would allow F&S to train and authorize certain key facility managers in proper procedures for impounding bikes parking improperly.  Housing will draft a proposal in the next few months, then F&S will discuss the merits with appropriate campus representatives (such as Legal Counsel, the Parking Department, and Campus Planning) and determine how to proceed.

    Sample Varsity Bike racks were provided for a one-year free trial to Champaign County Bikes.  The Architecture Review Committee approved testing them at the east side of the Illini Union.  The Union’s approval is pending an approval from SSC for the bike parking improvements at the southwest corner, with FY10 SSC funding.

  2. Undergrads and Graduates work on Sustainability Projects

    Associated Project(s): 

    Working with James Scholar in Barbara Minsker’s engineering class to make recommendations related to sustainability for the Grainger crosswalk on Springfield.

    Staff hosted interviews with about a dozen Rhet 105 students about various sustainability topics.

    Urban Planning masters student Marcus Ricci is doing a GIS project about bike parking capacity in relationship to the buildings they serve.

    The LINC U of I Bikes section sent out a bike sharing survey and had a great response rate, a summary will be available by the end of the spring semester.

  3. Monthly press on sustainability on campus

    Engineering News Record is doing a story on the University of Illinois about green buildings/LEED certification.

    Daily Illini article about campus sustainability progress.

    Staff created flowcharts for sustainability themes, as preliminary step to filling in the content on the Sustainability Portal website.  Staff provided field definitions and sample data for the database tables that will be available through the portal.  Also, we met with staff from MSTE and drafted the page layouts for the website, which will be shared at the iCAP Forum in April. 

  4. Engagement with other schools, information sharing

    We participated in meeting with representatives from Columbia, Missouri about their transit goals.  Articles were written about the visit: http://www.columbiatribune.com/news/2012/mar/13/gold-standard/, http://www.columbiamissourian.com/stories/2012/03/13/final-bus-trip/, and http://wjf.im/xkmY5f.

    We also provided information to Arizona State University about our bike registration system and intentions.

  5. Natural Resources Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 2,711 T-12 fixtures in the Natural Resources Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 424,466 hours. The simple payback for this project is 2.2 years.

  6. Biogasification power plant talk

    Associated Project(s): 

    F&S met with representatives from the Center for Neighborhood Sustainability to continue discussion of potentially building a biogasification power plant off campus for production of biogas as an alternative fuel for power generation for campus.

Pages