The iCAP 2020 objective 2.3.1 is to "Use at least 140,000 MWh/year of clean power by FY25." This objective is about clean power, which is different from clean thermal energy. The responsible campus unit for championing this objective is F&S.
As of 2020, there are three types of clean power options being pursued or used on campus.
- Solar Energy on Campus: installing solar photovoltaic panels on campus property
- Wind Energy on Campus: installing wind turbine generators on campus property
- Power Purchase Agreements for Clean Energy: purchasing solar or wind power from off-campus
Sub-projects
-
(Ongoing)
-
(Ongoing)
-
(Proposed)
Metrics
Total Purchased Clean Power
Annotations
- FY 2008:
Baseline
- FY 2009:
Production started at BIF
- FY 2014:
Production started at BRC
- FY 2015:
bought 20,000 RECs
- FY 2016:
Production started at the Wassaja and Solar Farm
- FY 2017:
PPA signed with RainSplitter Wind Farm in Nov 2016
- FY 2018:
Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power
- FY 2021:
includes first five months of Solar Farm 2.0
Website URL(s)
Recent Project Updates
-
12/18/2023
-
11/9/2023
Attached is the EPA GPP Reporting form for FY23.
Themes
-
Primary Theme:
Key Objective
-
3.3 Expand the Purchase of Clean Energy
(2015 iCAP) -
2.3.1 140,000 MWh/yr Clean Power
(iCAP 2020) -
47. 5% Renewable Sources
(2010 iCAP)