Mapping Sustainability [ARCHIVED]

This project is meant to map the sustainability related programs, facilities and organizations in the Champaign-Urbana Area. The purpose of this project is to inform the community of the sustainability programs the University is undertaking. There is also an educational component to the project, since a Univeristy of Illinois class will be involved. Visit the map at http://www.opengreenmap.org/greenmap/champaign-urbana-green-map.

Power Plant Carbon Sequestration via Algae Biodiesel Production

This project constructed an Algae Biodiesel Production Facility at Abbott Power Plant. The facility's purpose is to sequester some of the flue gases produced at the power plant while providing a renewable, carbon-neutral fuel source for transportation. The project involves several student organizations and has research potential. The Student Sustainability Committee provided the project with $13,000 worth of funding in 2008.

Illinois Natural History Survey: LEED Silver

The Illinois Natural History Survey was awarded the LEED Silver Certification on August 1, 2012. The building received 36 of the 69 possible points. With a staff of over 200 scientists and technicians, the Illinois Natural History Survey is recognized as the premier natural history survey in the nation. The resources needed to effectively support the Survey have changed considerably since their current headquarters building was completed in 1942.  

Nugent Hall: LEED Silver

Nugent Hall (the Champaign Housing Residence Halls Phase A) was awarded the LEED Silver Certification on January 20, 2011. Nugent received 34 of the 69 possible points on the LEED Scorecard. The construction was especially strong in the Indoor Environmental Quality, receiving 13 of the 15 possible points in that area. Nagle Hartray was selected as the Architect of Record in order to ease the transition in the unusual project delivery approach.

Ikenberry Dining Hall: LEED Silver

The Ikenberry Commons Dining Hall was awarded the LEED Silver Certification on August 17, 2011. The dining hall received 34 of the 69 possible points on the LEED Scorecard. Energy saving features of the facility include recycled content in 20 percent of the materials used to construct the building; water-efficient plumbing fixtures; energy-efficient lighting, heating, and cooling; low-VOC paints, coatings, and sealants; and a white reflective roof that reduces the need for cooling.

NCSA Petascale: LEED Gold

The NCSA Petascale Computing Facility was awarded the LEED Gold Certification on November 4, 2011.The building received 40 of the 69 possible points on the LEED Scorecard. Energy saving features of the building include a power distribution system that is based on 480 V power for the computational equipment, water-cooled computational and storage equipment (which is twice as efficient as air cooling), external cooling towers that allow for natural chilling of water for a large part of the year, law-impact landscaping with native prairie plants, and use of best practice construction methods.

Lighting Retrofit #5 [ARCHIVED]

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.

ICECF 2009 Lighting Retrofit [ARCHIVED]

The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17.

ICECF 2008 Lighting Retrofit [ARCHIVED]

The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13.