  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Solar Feasibility Study

    This proposal seeks to develop a list of campus buildings capable of hosting solar energy systems and conducting a detailed feasibility evaluation of five sites for installation of these systems.  Solar energy systems may be utilized for the generation of electricity or for the production of hot water for domestic use, and this study will examine both possibilities. Factors taken into account will be the building’s energy use profile and applications, the building characteristics, the surrounding environment, and the visibility to the student body. Additionally, the report will specify equipment and budget needs, as appropriate to prepare the projects for bid and implementation. Solar energy systems larger than those at the University of Illinois exist at over 70 institutions and the University has made a commitment to obtain 5% of total energy from renewable sources from 2015 and 25% by 2025, which will require the installation of solar energy systems on campus. Significant benefits to our education, research and outreach missions are also likely from these installations. Finally, the completion of this feasibility study will help enable the actual installation of these arrays as well as secure matching funds from sources such as the Department of Commerce and Economic Opportunity. The Student Sustainability Committee is in favor of funding a grant in the amount of $9,900.

  2. Allerton Geothermal Project Funding Letter

    This proposal seeks to install a geothermal system at the Evergreen lodge and Retreat Center. The Evergreen Lodge is a 2828 sq. ft. structure used as lodging facilities for retreat center guests. The installation will result in energy savings of ~ $2,000 annually and provide the University with experience in handling geothermal installations – none of which are currently installed at the University. This project is also being supported by grant funds from the Department of Commerce and Economic Opportunities. Committee funds will be utilized for purchase and installation of equipment, such as a ground source heat pump unit, as well as drilling of borehole heat exchange pipes. Additionally, Allerton park has agreed to install an on-site educational display about geothermal energy. The Student Sustainability Committee is in favor of funding a grant in the amount of $18,000.

  3. Solar Decathlon 2011 Funding Agreement

    This proposal seeks to provide funding for student education centered around the University of Illinois’s participation in the 2011 US Department of Energy Solar Decathlon Competition. Each student team participating in this prestigious, international competition is required to build an entirely solar-powered 800 sq. foot house with innovative design features. This grant will provide funds for the development of new courses and enhancement of existing courses, provisioning of course materials and software, and the sponsorship of guest lecturers and consultants ($25,000), the employment of graduate students in coordinating roles for education and volunteer engagement activities ($15,000), and student travel associated with the competition ($10,000). The last UI entry in the Solar Decathlon competition engaged hundreds of students and was the highest-placed US finisher in the Competition; furthermore this participation will require the team to raise $700,000 at a time of severe campus budget constraints. Thus, the Student Sustainability Committee is in favor of funding this proposal in the amount of $50,000.

  4. iCAP completed

    In May 2010, iCAP was completed with the following goals (for the wind project):

    • Goal is to eventually make the U of I carbon neutral by 2050
    • Describes a path toward the fulfillment of the commitment of the American College & University Presidents’ Climate Commitment (signed by University in 2008)
    • Among the commitment the University is making in order to achieve carbon neutrality goal is renewable energy
    • Target: “Strive to meet the requirements for renewable energy generation in the ILRPS both on campus (priority) and off campus (if necessary) as follows:
      • 5 percent of total campus energy from renewable sources by fiscal year 2015
      • 17.5 percent of total campus energy from renewable sources by fiscal year 2020
      • 25 percent of total campus energy from renewable sources by fiscal year 2025
      • End coal usage at Abbott Power Plant by 2017”
    • Among the 5 strategies to do this: “Install at least three utility-scale wind turbines on the south campus, with a minimum of one to be installed by 2011”
    Attached Files: 
  5. 2010 iCAP Solar goals

    Associated Project(s): 

    The 2010 iCAP included goals to increase renewable energy on campus.  Regarding solar energy, the 2010 iCAP said, "A full study for solar electric or thermal energies has not yet been conducted. Estimates of the built campus area of ~5 square kilometers can likely accommodate 5 percent solar photovoltaic (PV) array coverage as rooftop solar—or about 250,000 square meters, with peak generation capacity of 25 MW, and generating 45 million kWh of electricity. This has the potential to displace 10 percent of current campus electricity usage. Potential for larger tracking arrays on the South Farms also exists."  It also included the strategy, "Increase the amount of solar photovoltaic and thermal projects."

  6. Solar Decathlon 2009 Funding Agreement

    This proposal seeks to provide funding for student education centered around the University of Illinois’s participation in the 2011 US Department of Energy Solar Decathlon Competition. Each student team participating in this prestigious, international competition is required to build an entirely solar-powered 800 sq. foot house with innovative design features. This grant will provide funds for the development of new courses and enhancement of existing courses, provisioning of course materials and software, and the sponsorship of guest lecturers and consultants ($25,000), the employment of graduate students in coordinating roles for education and volunteer engagement activities ($15,000), and student travel associated with the competition ($10,000). The last UI entry in the Solar Decathlon competition engaged hundreds of students and was the highest-placed US finisher in the Competition; furthermore this participation will require the team to raise $700,000 at a time of severe campus budget constraints. Thus, the Student Sustainability Committee is in favor of funding this proposal in the amount of $50,000.

  7. Open Geothermal at ISTC Project Funding Agreement

    The goal of this project is to conduct a feasibility study regarding installing an open geothermal loop underneath the Illinois Sustainable Technology Center.  The open geothermal loop would take water from one of the many nearby aquifers and only introduce heat into the system.   The project will increase awareness of geothermal systems, determine the physical and chemical attributes of the aquifer, and study integrating the geothermal system with the current HVAC system.  The ISTC hopes to decrease their energy use and greenhouse gas emissions by 25%-50%. The ISTC would test the procedure on this building, but hopes to extend it to other campus buildings.  Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $27,000.

  8. Green Allerton Wood-fired Boiler Funding Agreement

    The goal of this project is to replace a natural gas heating system at Allerton Park with an Outdoor Wood-fired Boiler System. This replacement will eliminate considerable CO2 emissions from the current system and result in substantial cost savings. The use of a renewable resource (wood) in place of a non-renewable one (natural gas), combined with the greenhouse gas emissions reduction will help increase campus sustainability, thus the Student Sustainability Committee is in favor of funding the full requested amount of $25,500.

  9. Project kick off

    Associated Project(s): 

    The kickoff meeting for the ISTC geothermal study was led by Todd Rusk at ISTC on March 9, 2009.  The agenda was 1) to discuss the overall project objectives, tasks, and requirements and 2) to begin preparations for drilling the test wells.

    Participants included: Tom Abram, Eliana Brown, Kenneth Hlinka, Thomas Holm, Michael Jeffords, David Larson, Tim Lindsey, Kent Reifsteck, Bill Shilts, Douglas Walker, and Angela Wisehart.