Projects Updates for place: Physical Plant Service Building

  1. Newmark Civil Engineering Laboratory

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 2,977 T-12 fixtures in the Newmark Civil Engineering Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 403,004 hours. The simple payback for this project is 1.17 years.

  2. Computing Applications Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 621 T-12 fixtures in the Computing Applications Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 113,735 hours. The simple payback for this project is 0.74 years.

  3. Medical Sciences Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 2,195 T-12 fixtures in the Medical Sciences Building were replaced with the more energy-effiecient T-8 fixtures. This switch will incur an Annual kWh Savings of 416,547 hours. The simple payback for this project is 11.68 years.

  4. 2010 iCAP commitment

    Associated Project(s): 

    The 2010 iCAP executive summary included this commitment:

    "The University will establish a dedicated, centrally coordinated funding pool for energy conservation projects within the next three years. This “clean energy” fund will allow for both internal (student fees, faculty contributions, staff contributions, energy savings reinvestment, capital programs), and external (programs, rebates, donations, outside investors) participation. It will be established as a capital infusion and coordination mechanism aimed at physical energy and energy cost reductions that also allows for the sustained maintenance of these investments."

  5. Roger Adams Laboratory (completed)

    Associated Project(s): 

    A portion of the T-12 fixtures in the Roger Adams Laboratory were retrofitted in the 2008 leg of the ICECF Lighting Retrofit. The remaining 2,064 fixtures were replaced in the 2009 Retrofit, however, allowing an additional Annual kWh Savings of 157,759 hours. The Simple Payback for the replacing these fixtures in the remaining portion of the building is 3.34 years.

  6. Undergraduate Library

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 2,294 T-12 fixtures in the Undergraduate Library were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 508,525 hours. The simple payback for this project is -0.17 years.

  7. Turner Student Services Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 628 T-12 fixtures in the Turner Student Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,474 hours. The simple payback for this project is 2 years.

  8. Wohlers Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,071 T-12 fixtures in the Wohlers Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 168,358 hours. The simple payback for this project is 0.83 years.