  1. $250,000 available in FY13; allocation process TBD

    Associated Project(s): 

    Mike Marquissee confirmed the funding available for allocation in FY13 is $250,000. Doris Reeser stated that there will be no AFMFA allocation meeting this year.  It was decided that the call for proposals should wait until there is at least $1M to allocate from this fund.  Therefore, there will not be a selection process during FY13.

  2. Campus Revolving Loan Fund

  3. FY12 Projects Selected

    Associated Project(s): 

    These projects were selected for FY12 RLF funding, in this priority order:

    __________________________________________________________________

    Lighting Retrofits

    RLF Requested: $1,500,000

    This project is part of a campus-wide effort to upgrade all T12 fluorescent light fixtures to yield improved lighting quality for the users while decreasing operating and maintenance expenses.  This project involves energy-saving upgrades to lamps and ballasts of existing fluorescent light fixtures in (53) campus buildings.  We are requesting funding in the amount of $1.5 million, although the work is scalable and any funding amount can be successfully applied.  The total campus need for lighting retrofit is approximately $3.1 million.  Partial grant reimbursement of $800,000 is available.

    __________________________________________________________________

    Occupancy Sensors

    RLF Requested: $500,000

    This project will install occupancy sensors for control of lighting and HVAC in approximately (30) campus buildings.  As a result, energy use will be decreased up to 30% in affected areas.  This is an expansion and continuation of projects in the past two years, which have focused on installation of occupancy sensors in student classrooms. We are requesting funding in the amount of $500,000, although the work is scalable and any funding amount can be successfully applied.  The total campus need for occupancy sensors is over $6.5 million.  Partial grant reimbursement of up to $40,000 is available.

    __________________________________________________________________

    LED Exit Signs

    RLF Requested: $250,000

    This project will replace existing exit signs with efficient LED fixtures in approximately (14) campus buildings.  As a result, energy use will be decreased, life safety systems will operate more reliably, and maintenance needs will decrease dramatically.  This is a continuation of projects funded in FY07 and FY08. We are requesting funding in the amount of $250,000, although the work is very scalable and any funding amount can be successfully applied.  Partial grant reimbursement of up to $7,000 is available.

    __________________________________________________________________

     

  4. SSC and F&S work to develop a conservation fund

    Associated Project(s): 

    During the summer of 2011, the Student Sustainability Committee (SSC) Chair, Suhail Barot, and the F&S Sustainability Coordinator, Morgan Johnston, worked with the Utilities and Energy Services Division of F&S to develop an energy conservation fund.  Discussions included topics such as:

    • source of initial funds
    • qualification requirements for projects
    • selection process for funding
    • resources needed to manage the fund and process

    One comment made by the Director of Utilities and Energy Services, Kent Reifsteck, was that this is a "fund for departments to access to allow them to implement energy conservation measures in order to take advantage of the Energy Incentive Program."  The incentive program was next step#2 from the Utilities Stewarding Excellence report. 

  5. Gregory Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 426 T-12 fixtures in Gregory Hall were replaced with the more energy-effiecient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,862 hours. The simple payback for this project is -4.1 years. There are 777 T-12 fixtures in Gregory Hall remaining to be switched.

  6. David Kinley Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 858 T-12 fixtures in the David Kinley Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 84,223 hours. The simple payback for this project is -5.36 years. There are 54 fixtures that remain to be done in David Kinley Hall.

  7. Morrill Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 195 T-12 fixtures in Morrill Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 25,781 hours. The simple payback for this project is -4.45 years. There are 2,594 T-12 fixtures in Morrill Hall that remain to be switched.

  8. Lincoln Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,728 T-12 fixtures in Lincoln Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,886 hours. The simple payback for this project is -8.03 years.

  9. Vet Med Basic Sciences Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 4,248 T-12 fixtures in the Vet Med Basic Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 796,429 hours. The simple payback for this project is 0.11 years.

  10. Vet Med Large Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,990 T-12 fixtures in the Vet Med Large Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 320,117 hours. The simple payback for this project is 0.23 years.

  11. Vet Med Small Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,928 T-12 fixtures in the Vet Med Small Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 67,145 hours. The simple payback for this project is 0.83 years.

  12. Vet Med Chiller Plant

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 115 T-12 fixtures in the Vet Med Chiller Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 28,742 hours. The simple payback for this project is -0.2 years.

  13. Abbott Power Plant (partial)

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 177 T-12 fixtures in the Abbott Power Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 27,909 hours. The simple payback for this project is 0.74 years.