Projects Updates for Electrical and Computer Engineering Building: LEED Platinum
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
SSC Semesterly Report: Electrical and Computer Engineering Building (ECEB) Interactive, Energy Education Production Use Display
Associated Project(s):SSC received semester report for Spring 2021 on 9/24/21 for Electrical and Computer Engineering Building (ECEB) Interactive, Energy Education/Production/Use Display project. Please see attached.
Info from Andy Robinson at F&S
Associated Project(s):I am on the team that did the Retrocommissioning project in 2018 and I would be happy to share some of our knowledge from that process. Below is the link to a presentation of that project that we took to a Big Ten energy conference. Some of our main takeaways are that the combination of chilled beams, dual HX wheels, coil sizing, occupancy ventilation, and thoughtful building pressurization have led to one of the most efficient buildings on campus. Also, the heat pumps work well to heat/cool with electricity, but would be optimal if there were more of a reheat load, or a hot water loop to send reject heat to a neighboring building in summer, which campus is looking into in certain locations.
https://www.fs.illinois.edu/services/utilities-energy/energy-conservation/rcx-energy-results
Andy Robinson, LEED-AP, CEM
DDC Specialist, F&S Energy Services - RCx