You are here
- Home
- SSC Final Report: Bike Path Renovation: Armory Avenue Path South of Gregory Hall
SSC Final Report: Bike Path Renovation: Armory Avenue Path South of Gregory Hall
Posted by Sarthak Prasad on June 19, 2020
The construction on the path began in summer 2020 and was completed by the time students returned to campus. The old bike paths, along with hedges, overgrown evergreens, and decorative urns were removed from the area. A new 6 foot wide path was constructed and plans have been made to restore the landscape as needed. The Armory Avenue bike path is now open to use!
This project tied in with the renovation of the entire Armory Ave bike path that connects the bike lane on Armory Ave to the bike lane on Goodwin Ave. This bike path goes through the Gregory Hall, Foellinger Auditorium, Smith Hall, IGB, and Bevier Hall.
Please see attached the final report for this project.
See the previous update for this project.