- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
Morgan requests AiM account for project
Associated Project(s):Morgan sent an email to Janet Spencer in F&S Operations, Maintenance, and Alterations business office, about getting an AiM account for the SSC CFOP with this funding.
Library interested in getting bike lockers
Associated Project(s):Hi Jim and Morgan,
Can this project be funded in total by the Students for Sustainability grant? If not, there is insufficient support at this time from the Library to assist in funding the initiative.
Thanks
Jeff
From: Lev, James R
Sent: Wednesday, September 04, 2013 4:24 PM
To: Slater, Robert; Johnston, Morgan B; Schrader, Jeffrey M
Cc: Neptune, Amelia
Subject: RE: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERThanks
The proposal raises some questions. Some practical, some policy.
We will meet with Amelia and she can do a little research for us.
Jim
James R. Lev AIA
Architect, Capital PlanningUniversity of Illinois
Planning Division, Facilities & Services
1501 South Oak Street, 115B PPSB MC-800
Champaign, Illinois 61820(217) 244-5095, fax (217) 244-5775
Email: jrlev@illinois.edu
url: www.fs.uiuc.eduFrom: Slater, Robert
Sent: Wednesday, September 04, 2013 2:00 PM
To: Johnston, Morgan B; Schrader, Jeffrey M
Cc: Neptune, Amelia; Lev, James R
Subject: RE: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERThanks Morgan.
I was curious about how much these cost, so I checked with one of the companies that seems to be used by several other Universities and major public venues around the country (although there are two other companies that also seem popular I didn’t check with them for comparative quotes, since this was very preliminary research). I worked with Brittany Chavez (turtle.storage.ltd@gmail.com) from the American Bicycle Security Company and she provided the attached quote for a trial size set (25 units) which runs about $40,000 (including delivery) and, I’m spitballing here, but I’m guessing another $5,000-$10,000 in local labor to have them installed, so about $50,000 ($2,000/unit) complete.
This include some local customization (orange/blue theme, i-mark on the front door).
-Robert
From: Johnston, Morgan B
Sent: Wednesday, September 04, 2013 1:52 PM
To: Schrader, Jeffrey M; Slater, Robert
Cc: Neptune, Amelia; Lev, James R
Subject: RE: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERHi Robert and Jeff,
The appropriate approval for a bike locker would come from the Architecture Review Committee (ARC). Jim Lev, copied here, is the chair of that committee. I always start with them for proposed changes to the exterior campus space.
I’ve also copied Amelia Neptune here, as the Campus Bicycle Coordinator in my office. She would be a good reference for understanding the preferences of cyclists around campus, if you would like that input.
Please keep me informed about any decisions to put in bike lockers. It is one of the items that we get asked about and I’d like to know if you do end up getting some installed.
Thanks a ton,
Morgan
From: Schrader, Jeffrey M
Sent: Wednesday, September 04, 2013 1:10 PM
To: Slater, Robert
Cc: Johnston, Morgan B
Subject: RE: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERHi Robert,
Morgan Johnston would be the Campus contact. I will let her answer your questions.
Thanks
Jeff
From: Slater, Robert
Sent: Wednesday, September 04, 2013 11:30 AM
To: Schrader, Jeffrey M
Subject: RE: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERHey Jeff,
I finally got a quote back from those bicycle locker companies. They run about $1500-$2000 a piece (unless you are ordering a ton, in which case the offer a per unit discount). What campus entity makes the decision on what bike racks are purchased and where they are installed? Does each college/unit decide for the area around their building? On their own or with the blessing of campus facilities?
From: University of Illinois Library News [mailto:LIBNEWS-L@LISTSERV.ILLINOIS.EDU] On Behalf Of Schrader, Jeffrey M
Sent: Wednesday, September 4, 2013 11:19 AM
To: LIBNEWS-L@LISTSERV.ILLINOIS.EDU
Subject: Re: FACILITIES NOTICE: Bicycle Thefts Across Campus - REMINDERThe bicycle thefts across Campus continue. Please review the Libnews message below sent in July 2013.
Also, please remember bicycles are not allowed in Campus Buildings.
Campus Policy
http://admin.illinois.edu/policy/code/article2_part6_2-601.html
Library Policy
The Library policy is in the patron policy section under Use of Bicycle and Laptop Locks:
http://www.library.illinois.edu/administration/services/policies/patron_conduct.html
Thank you
Jeff Schrader
From: Schrader, Jeffrey M
Sent: Monday, July 22, 2013 10:20 AM
To: LIBNEWS-L@LISTSERV.ILLINOIS.EDU
Subject: FACILITIES NOTICE: Bicycle Thefts Across CampusFACILITIES NOTICE:
Bicycle Thefts Across Campus
There has been an increase in bicycle thefts in north and central campus areas over the past few months. The four most recent have involved security cables being cut. Individuals may wish to purchase locks that cannot be cut.
Local retailers:
http://www.meijer.com/catalog/search_command.cmd?keyword=bike+locks
Jeff Schrader
meeting with Morgan and Amy
Associated Project(s):Amy Liu and Morgan Johnston discussed the process for moving forward.
- Morgan will submit a work order to F&S installers.
- Morgan will schedule a tour of the proposed locations, with Amy, Morgan, and the F&S installation contact.
- F&S installers will proceed to install the glass fillers as quickly as possible, in the order previous identified.
- Amy will meet with the Illinois Student Senate, Environmental Sustainability Committee, to seek their attention to this project.
- Amy will continue working on the anti-water bottle campaign.
Engineering Work Orders created for Occupancy lighting and HVAC sensors
Associated Project(s):Work Orders were issued to do the engineering design for occupancy sensors. See attached list.
Attached Files:FY13 LEED buildings update
List of Locations
Associated Project(s):David Mischiu and Amy Liu met today to form a very basic list of priority buildings for filler installment. Additionally, they determined which floors for each building would be most useful to have them on. Here is the list, 1 indicating highest priority.
- Undergraduate Library, floors 1 and ground level
- Grainger Library, all floors
- Ikenberry Commons, floor 1
- Armory, floors 1 and 3
- Wohlers Hall, floors 1 and 2
- Loomis Lab, floors 1 and 2
- Siebel Center, basement and floor 1
- Natural Resources Building, floors 1 and 2
They still want to take a look a few more buildings in the quad. Whatever is surveyed from that might not even change the list presented already, but add to how this project could materialize in the future.
Update from Tracy Osby at the Waste Transfer Station
Associated Project(s):The saw dust pan at the PPSB is no longer emptied at the WTS. We are currently emptying it at the Horse and Dairy barns. It is now being diverted from the landfill. Also, the DSC staff that work here at the WTS work hours has been extended to 3:30PM provided we have work for them here to do. This way all the pans with the exception of the compactors from Dining Services and the trash from ORD will be emptied in the south bay here at the WTS.
Phoenix will comply with US Steel requirements
Associated Project(s):-----Original Message-----
From: Borkowski, Joe [mailto:J.Borkowski@Phoenixsolar.us]
Sent: Tuesday, August 27, 2013 2:11 PM
To: Johnston, Morgan B; Dempsey, John Garrett
Subject: U.S. Steel use for University solarMorgan,
This email is to attest Phoenix Solar will comply with Illinois and Federal Buy American procurement provisions. For the purpose of clarity, Phoenix Solar will ensure the steel that is used on this system will be procured and manufactured in the United States.
I look forward to speaking soon.
Best regards,
Joe Borkowski
New Bicycle Maintenance Classes Offered Fall 2013
Associated Project(s):The Campus Bicycle Shop will be offering a new series of bicycle maintenance courses during the Fall 2013 semester, beginning Wednesday, September, 18. Course descriptions, times, locations, and costs are listed here. Contact James Roedl, Campus Bicycle Shop Manager, for more information.
Bicycle Ambassador Program Launching
Associated Project(s):Applications are now being accepted for a new Bicycle Ambassador program at the University of Illinois. Bicycle Ambassadors are bicycling enthusiasts who will promote bicycling for transportation, raise awareness about the rights and responsbilities of cyclists, and foster a postitive bicycle culture on our campus. Interested students, staff, and faculty are encouraged to sign up to become a Bicycle Ambassador today!
Learn more on the Bike Ambassador project page: https://icap.sustainability.illinois.edu/project/bicycle-ambassador-program
Volts at the Car Pool for check-out from the Fleet
Associated Project(s):See files
Attached Files:2014 Bicycle Guide & Map Released
Associated Project(s):Champaign County Bikes, with support from the University of Illinois, the Cities of Champaign and Urbana, and many local area organizations and businesses, has released the 2014 Champaign-Urbana-Savoy Area Bicycle Guide and Map.
The Office of the Dean of Students sponsored the printing of 12,000 copies of the map for Campus, which are being distributed to units in August. University staff and student interns worked with CCB to help edit and design the Guide and Map.Initial Meeting with Campus Parking, Car pool and Sustainability
Associated Project(s):The first meeting was held on August 6th to discuss campus public use EV charging station plans.
It was determined at this time more research into parking enforcement options, types of charging stations to use, and sites available for installation is needed. Follow-up meeting to take place after research findings are completed.
To this date no method exists to interface from the chargers software to the campus parking enforcement software.
See picture below: with this type of charger the enforcement officer could identify that billing is taking place by the Solid lightning bolt on the right as opposed to the one on the left.
Report by Anna Hochlater
Associated Project(s):"The Burrill/ Morrill Hall corridor offers a unique opportunity to explore methods of sustainable design through conventional practices of rain garden design as well as hardscaping improvements, lighting installations and additional non-plant strategies. A moderate strategy is advised. In this conversation moderate is understood to mean more than a creating only rain garden while leaving the existing vegetation, but less than a full redesign which would completely reshape the hardscaping. A moderate strategy addresses the creation of the rain garden, all the landscape beds while leaving the mature canopy trees in place, and makes some alterations to the existing hardscape. Perhaps the most difficult challenges of the corridor will be to unify the character of the corridor landscape beds and to design a solu-tion suitable for the harsh conditions of very little sun, significant wind, and heavy pedestrian use."
Attached Files:Update from Justin Johnston at UI Purchasing
Associated Project(s):Justin Johnston confirmed that the answers to all the State Purchasing Officer's questions have been sent to Steve Rotello, the State Purchasing Officer. Justin is working to set a meeting with the SPO, Justin, and Morgan Johnston to review the current status of this approval.
Solar Houses moving to Energy Farm
Update from Bill Krudienier
Associated Project(s):Morgan encouraged Bill to ask the SSC for funding to do the design work for a rainwater harvesting system for the Hartley Gardens. He said he will talk with Matt Edmonson to get an estimate of the cost for the project, so he is ready to reqeust funding when the SSC call for inquiries goes out this fall.
Update from Bill Krudienier
Associated Project(s):There are native plants throughout the Arboretum and in concentrated paces around the ponds - wetland and mezic. There is also a prairie just south of the Polinatarium, maintained by John Marlin and volunteers.
Plants moved to Arboretum
Associated Project(s):The ODMFL plants have been moved to the Arboretum growth house. Sarah talked with Bill Krudienier and moved the plants to the Arboretum as they continue to grow. Bill met with May Berenbaum and Terry Harkness to discuss the best use of the plants in the Arboretum, within the master plan for the site. It is possible that they will put them near the Pollinatarium and the children's garden.
The Arboretum is very pleased to be able to help and excited about the possibilities for these plants and future endeavors.