  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Best and Final Offer (BAFO) received

    Associated Project(s): 

    The preferred vendor, as identified through the RFP evaluation process, was asked to submit a Best and Final Offer (BAFO). This item was received and the campus will finalize exact funding plan.

  2. Fourth Street from Armory Avenue to Kirby Avenue

    Associated Project(s): 

    This project will include resurfacing of Fourth Street from Armory Avenue to Peabody Drive and reconstruction from Peabody Drive to Kirby Avenue. It will incorporate on-street bike lanes, curb bump outs for narrowed crossing distances at selected intersections, and new traffic signals at the intersection of Fourth Street and Peabody Drive.

  3. Sixth Street from Armory Avenue to Gregory Drive

    Associated Project(s): 

    This project will reconstruct pavement on the worst condition high volume streets and add bike lanes per current campus standards. This work will occur on Sixth Street from Armory Avenue to Gregory Drive. This will also upgrade the traffic signal at the intersection of Sixth Street and Gregory Drive to meet current federal standards and include pedestrian countdown signals.

  4. Gregory Drive from Oak Street to First Street

    Associated Project(s): 

    This project will include total removal and reconstruction of Gregory Drive, between Oak Street and First Street, including existing parking along street. This project will also include parking meters and some new sidewalks.  This segment of roadway is intended to be marked as a bicycle route, as part of the Campus Bike Network.

  5. Campus Bike Project Funding Agreement

  6. Funding Award and Acceptance Letter_ECE Solar

    The new Electrical and Computer Engineering building (New ECE building) will be operational starting the fall semester of 2014, and will be a unique green building on the University of Illinois campus. It is designed to be the most energy efficient engineering building in the world and is targeting LEED platinum certification, the highest rating for efficiency. With the full planned solar energy complement, the building is projected to achieve net zero energy status. The facility will be one of the two largest net-zero energy buildings in the United States. It will be a facility that supports all its own energy needs – on average over each year – leaving no carbon or fossil consumption footprint. Although the ECE building design itself is intended to achieve LEED Platinum certification, the energy objectives go far beyond this rating to true energy sustainability.

  7. Energy Shade Curtains PSL Greenhouses

    Energy shade curtains have many benefits for greenhouses including optimization of natural light reaching the crop canopy and reductions in heating inputs and electricity for cooling equipment and lighting. This is the 3rd phase of funding provided to the Plant Care Facility (Turner Hall Greenhouses) for curtain installation and programming, and 7 additional curtains were installed at a total cost of $71,000. Meters installed in rooms with and without curtains continue to track energy savings, and have shown an overall 50% heating use reduction, 30% electricity use reduction, and 30% water use reduction (for cooling) during fall and winter months.

  8. Student Farm Funding Agreement

  9. Campus Bike Parking Overhaul Phase 1_Funding Award and Acceptance

  10. Burrill and Morrill Rain Garden Spring 2012 Funding Award and Acceptance

  11. Main Library Steam Reduction Project Funding Award and Acceptance Letter

  12. Campus Revolving Loan Fund