Projects Updates for place: Henry Administration Building

  1. Explanation of calculations

    We take total energy usage by building (electricity, Steam, Nat Gas and Chilled Water) convert all of those to one common unit, MMBTU (million British Thermal Units) and after adjusting for the weather differences between years, compare each building's annual usage with the year before.  We then convert the change into a percentage and then rank all eligible buildings by percentage saved.  The top four in each category win first through fourth.     Having won in FY13 does not disqualify you from winning in the future.  The goal is to encourage individual contributions to saving energy.   Mike Marquissee

  2. IMEC Tracking Presentation

    Morgan Johnston met with Seth Rients and Luis Rodriguez to hear a presentation about the IMEC waste tracking system.  The system could be installed on campus dumpsters, along with corresponding scales on the garbage and recycling trucks.  This would be an automated data collection method for tracking the waste stream inputs at a macro level.

  3. Meeting about waste stream audits

    Seth Rients and Morgan Johnston met to review the scope of the work requested by F&S.  Seth noted that it would be great to have scales in trucks and a system for tracking where the waste materials are generated.  They also discussed the methodology details.  Where could the waste be sorted and weighed for each building?  Can each dumpster be collected individually during the week or two of the audit for that location and driven to the sorting site?  What level of sorting do we need to meet our plans?

  4. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  5. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  6. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  7. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  8. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  9. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  10. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  11. Foreign Language Building

    Associated Project(s): 

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  12. Krannert Center for the Performing Arts

    Associated Project(s): 

    A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26  years.

  13. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  14. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.

  15. Henry Administration Building

    Associated Project(s): 

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  16. Armory

    Associated Project(s): 

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  17. Mumford Hall

    Associated Project(s): 

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.

  18. Plant Sciences Laboratory

    Associated Project(s): 

    A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.

  19. Madigan Laboratory

    Associated Project(s): 

    A total of 2,587 lighting fixtures in Madigan Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 401,383 hours. The Simple Payback for changing the fixtures in Madigan Laboratory is 2.35 years.