You are here

Projects by Project Status

You can filter projects by Primary Theme and Project Status
(Tip: to find projects with no status, select "Is empty (NULL)" and any Project Status)

  • Proposed: The project is proposed by any committee or a group but has not been approved, or the work on this project has not started.
  • In Progress: Work has started or the project is a recurring effort (e.g., “energy conservation projects”). These should get a project update at least once per semester.
  • Ongoing: Ongoing projects do not necessarily require updates except if there is a change or additional effort needed.
  • Completed: Work is complete and the results are achieved, or the project effort has been finished.
  • Cancelled: Project did not finish and efforts have stopped.
Title Status Theme
2009 Bicycle Master Plan [ARCHIVED] Completed Transportation
2012 Exterior Doorway LED Lighting Completed Energy
2014 Campus Bike Plan [ARCHIVED] Completed Transportation
2015 Illinois Climate Action Plan (2015 iCAP) [ARCHIVED] Completed Reporting Progress
ADA Transition Plan and 2017 Supplement Completed Transportation
Allerton Climate Action Plan (apCAP) Completed Reporting Progress
Anaerobic Digester at Beef and Sheep Study Completed Energy
Annual International Sustainable Electronics Competition Completed Zero Waste
Annual Report to Deans' Budget Committee [ARCHIVED] Completed Reporting Progress
Appropriately Staff Zero Waste Efforts Completed Zero Waste
ARRA Large Customer [ARCHIVED] Completed Funding
Bevier Café Reusable Carry-out Program Completed Zero Waste
Bicycle Safety Posters by CCB [ARCHIVED] Completed Transportation
BIF Rooftop Solar PVs Completed Energy
Bike Sharing Feasibility Study Completed Transportation
Bike Shelter at Flagg Hall Completed Transportation
Bikeway Conceptual Designs [ARCHIVED] Completed Transportation
Biomass Boiler at the Energy Farm Completed Energy
Biomass co-firing pilot at Abbott Power Plant [ARCHIVED] Completed Energy
Bousfield Hall: LEED Platinum Completed Energy
Building a Lasting University Environment (BLUE) [ARCHIVED] Completed Reporting Progress
Burrill/ Morrill Walkway Completed Land and Water
Business Instructional Facility: LEED Platinum Completed Energy
Campus Honors House Completed Land and Water
Campus Instructional Facility: LEED Platinum Completed Energy

Pages