You are here

Projects Updates for place: Bevier Hall

  1. Whats new?

    Last year was spent trying to optimize the use of freshwater shrimp in the system.  After a less the satisfactory yield we are reintroducing Tilapia into the aquaponics system in the Turner Hall greenhouses.  The produce side of the system provides fresh baby greens and serves as a propagation station for the indoor herb garden. 
    To date there are 149 customers enrolled in the reusable to-go program.  Those customers have diverted waste from the landfill a total of 2847 times by ordering their take-out using our Chews to Reuse program. 
    We recently installed a herb washing station in the kitchen and hope to expand the our herb production to offer retail packaged herbs.  We currently grow 80-90% of our herbs hyper-locally using the LED lighting just outside our kitchen.
  2. Bevier Cafe Herb Garden Agreement - Signed

    The Bevier Café is a learning laboratory where FSHN students to get hands on experience running a food service establishment. The funding requested in this application will serve to purchase startup equipment for growing fresh herbs for use in their operation. The goals of this project are two-fold. The first is to produce “hyper-locally” grown fresh herbs to use in food production. Reducing our carbon foot print and aligning with iCAP sustainability goals. The second goal is education for students and the general public. Students will get to experience of a small scale farm to table operation. Students will be heavily involved in developing planting schedules to meet demand, plant care maintenance, and incorporating products into the menu. The public which we serve will not only be able to enjoy the fresh herbs incorporated into our recipes, but will have access to tours and educational information about the project. This proposal directly funds: 1) Indoor grow equipment for herbs 2) Installation costs from Facilities and Services.

  3. IUB Retrocommissioning and Occupancy Sensors Loan

    Program Background:

    The Student Sustainability Committee (SSC) is tasked with the allocation of the proceeds of two student environmental fees – the Clean Energy Technology Fee and the Sustainable Campus Environment Fee, to improve the sustainability of our campus. The committee has established a program to make funds available for efficiency projects that will be later returned for reinvestment in future projects.

    Committee funds will be made available to the Office of Sustainability which will carry out an inter-departmental transfer to the Receiving campus unit. The Receiving unit agrees to return the transfer to the Office of Sustainability, in installments, as described on the next page, for reuse by the SSC.

    Project Description:            

    The Illini Union seeks funding to retro-commission the Illini Union Bookstore building, and to install Occupancy Sensors in the Illini Union building. The Illini Union Bookstore building contains both academic and auxiliary units, and the SSC loan will allow for complete retro-commissioning of the building. Retro-commissioning is expected to cost $113,000; the RCx process identifies defective components within the HVAC systems, reconfiguring and controlling them to function more efficiently, decreasing wear and tear and extending their service life by 20 years (as part of a regular preventative maintenance program), as well as reducing building energy consumption.

    The SSC loan will also provide $67,000 to install lighting occupancy sensors in the Illini Union, in food service preparation areas, restrooms, office areas and meeting rooms, which will reduce energy and lighting use.

    Terms:

    The Student Sustainability Committee is in favor of the Office of Sustainability transferring an amount of $180,000 to the Illini Union completion of this work. These funds are to be drawn from the Sustainable Campus Environment Fee account managed by the SSC, as needed to complete the project. All funds requested from the SSC must be expended before 30th September 2010, else the unit must apply for an extension.

    The Illini Union agrees to return the funds provided by carrying out annual transfers to the Office of Sustainability due on the 15th of August of each year in the following manner:

    $20,000 – Due 15th August 2011

    $40,000 – Due 15th August 2012

    $40,000 – Due 15th August 2013

    $40,000 – Due 15th August 2014

    $40,000 – Due 15th August 2015

    The Office of Sustainability will direct them back to the Committee’s account. The Illini Union will provide a close-out report about the project after installation. The Illini Union will also appropriately publicize the Committee’s support of these projects.

    All funds provided by this transfer will be used in a manner consistent with University of Illinois policies and procedures.

  4. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  5. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  6. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  7. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  8. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  9. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  10. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  11. Foreign Language Building

    Associated Project(s): 

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  12. Krannert Center for the Performing Arts

    Associated Project(s): 

    A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26  years.

  13. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  14. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.

  15. Henry Administration Building

    Associated Project(s): 

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  16. Armory

    Associated Project(s): 

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  17. Mumford Hall

    Associated Project(s): 

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.

  18. Plant Sciences Laboratory

    Associated Project(s): 

    A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.

Pages