  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Plant Sciences Laboratory

    A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.

  2. Madigan Laboratory

    A total of 2,587 lighting fixtures in Madigan Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 401,383 hours. The Simple Payback for changing the fixtures in Madigan Laboratory is 2.35 years.

  3. Loomis Laboratory

    A total of 2,001 lighting fixtures in Loomis Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 316,267 hours. The Simple Payback for changing the fixtures in Loomis Laboratory is 2.61 years.

  4. Materials Research Laboratory

    A total of 2,253 lighting fixtures in the Materials Research Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 360,623 hours. The Simple Payback for changing the fixtures in the Materials Research Laboratory is 1.63 years.

  5. Mechanical Engineering Laboratory

    A total of 1,395 lighting fixtures in the Mechanical Engineering Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 245,845 hours. The Simple Payback for changing the fixtures in the Mechanical Engineering Building is 1.77 years.

  6. Talbot Laboratory

    A total of 1,814 lighting fixtures in Talbot Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 330,664 hours. The Simple Payback for changing the fixtures in Talbot Laboratory is 1.53 years.

  7. Engineering Sciences Building

    A total of 701 lighting fixtures in the National Soybean Research Center were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 110,376 hours. The Simple Payback for changing the fixtures in the Engineering Sciences Building is 3.04 years.

  8. Project kick off

    Associated Project(s): 

    The kickoff meeting for the ISTC geothermal study was led by Todd Rusk at ISTC on March 9, 2009.  The agenda was 1) to discuss the overall project objectives, tasks, and requirements and 2) to begin preparations for drilling the test wells.

    Participants included: Tom Abram, Eliana Brown, Kenneth Hlinka, Thomas Holm, Michael Jeffords, David Larson, Tim Lindsey, Kent Reifsteck, Bill Shilts, Douglas Walker, and Angela Wisehart.

  9. Students' letter to the Governor

    In late January 2009, students wrote a letter to the Governor, Pat Quinn, requesting him for support and assistance in the campus wind farm project. This letter addressed the need of wind generation capacity on campus and requesting the governor to persuade the Chancellor to bring the wind power to the campus.

    Attached Files: 
  10. SSC and SECS letter writing campaign

    In January 2009, the Student Sustainability Committee (SSC) and Students for Environmental Concerns (SECS) wrote letters to the university administration (trustees, Chancellor and Provost’s offices, deans and assistant deans, department heads, faculty and senate faculty) asking for support for the campus wind farm project.

  11. Altgeld Hall

    A total of 740 lighting fixtures in Altgeld Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 123,985 hours. The Simple Payback for changing the fixtures in Altgeld Hall is zero years, since the Classroom Renovation Project funded this work. Occupancy sensors were also installed in the lighting retrofit of this building in order to provide further energy savings.

  12. Law Building

    A total of 2,539 lighting fixtures in the Law Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 421,882 hours. The Simple Payback for changing the fixtures in the Law Building is 3.07 years.

  13. Green Roof Metrics Class

    The Student Sustainability Committee funded a the Green Roof Metrics Class Project, which will support class projects to assess the impact on sustainability of the green roof on the new Business Instructional Facility. Students in Professor Werth's Hazardous Waste Management course in Spring 2009 and Sustainable Urban Engineering course in Fall 2009 will make measurements of the filtration and thermal properties of the green roof. Hopefully, these projects will also help establish the roof as a laboratory for future student and faculty research projects on this topic. The SSC gave $13,100 in funding.

  14. Second Team added

    Associated Project(s): 

    The first Retro-Commissioning (RCx) team was created in August of 2007. Due to their significant success in saving energy, a second team was started in January of 2009. 