You are here
Project Updates search results
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
Morrill Hall
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 195 T-12 fixtures in Morrill Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 25,781 hours. The simple payback for this project is -4.45 years. There are 2,594 T-12 fixtures in Morrill Hall that remain to be switched.
Lincoln Hall
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,728 T-12 fixtures in Lincoln Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,886 hours. The simple payback for this project is -8.03 years.
Vet Med Basic Sciences Building
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 4,248 T-12 fixtures in the Vet Med Basic Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 796,429 hours. The simple payback for this project is 0.11 years.
Vet Med Large Animal Clinic
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,990 T-12 fixtures in the Vet Med Large Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 320,117 hours. The simple payback for this project is 0.23 years.
Vet Med Small Animal Clinic
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,928 T-12 fixtures in the Vet Med Small Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 67,145 hours. The simple payback for this project is 0.83 years.
Vet Med Surgical Obstetrics Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 212 T-12 fixtures in the Vet Med Obstetrics Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 78,687 hours. The simple payback for this project is -0.73 years.
Vet Med Chiller Plant
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 115 T-12 fixtures in the Vet Med Chiller Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 28,742 hours. The simple payback for this project is -0.2 years.
Abbott Power Plant (partial)
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 177 T-12 fixtures in the Abbott Power Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 27,909 hours. The simple payback for this project is 0.74 years.
Quick payback projects
Associated Project(s):At some point in the past, perhaps FY 09, Terry Ruprecht and the Provost’s office worked out an agreement to provide a funding source for “quick payback projects.” This meant that the payback was expected to be quick, typically in the 1-3 year range. This was a onetime funding source. A variety of projects (10-15) have been brought forward and funded at a value of approximately 1 million dollars. These projects have included lighting retrofits, fume hood removals, chiller control upgrades, adding variable frequency drives (VFDs) to HVAC equipment, temperature control upgrades, and hot water control valve replacements.
Notes from workshop on iCAP Implementation
Associated Project(s):Attached Files:No Summer Coal Buring
Associated Project(s):Beginning April 12, 2011 Abbott Power Plant will no longer burn any coal during the summer, when natural gas is enough to meet the campus energy demands.
UIUC Campus Bike Plan Presentation 2011
Associated Project(s):Presentation on bike counts, along with proposed bike facilities, costs, and updates.
Attached Files:City of Champaign Council Goals for Sustainability Presentation 2011
Associated Project(s):Presentation discusses current sustainability projects and programs within Champaign, along with future opportunities.
Digital Computer Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 2,793 T-12 fixtures in the Digital Computer Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 422,793 hours. The simple payback for this project is 0.23 years.
Matt Edmonson assigned as Capital Planner for study
Associated Project(s):Planning Division brought into discussion, so the project can get implemented. Matt Edmonson assigned as capital planner for the Food Waste Composting Feasibility Study.
Coordinated Sciences Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,903 T-12 fixtures in the Coordinated Sciences Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 295,922 hours. The simple payback for this project is 0.78 years.
Energy presentation at CSL
Associated Project(s):Energy details on display at Coordinated Science Lab.
Illinois State Water Survey
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,154 T-12 fixtures in nine buildings belonging to the Illinois State Water Survey were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 181,017 hours. The simple payback for this project is -2.45 years.
James Hoffer, student intern, created building list file
Associated Project(s):James provided the attached list of buildings audited by student teams in FY11. Unfortunately, these audits were rushed and incomplete. There were many follow up discussions about paying the student teams as originally intended, and in the end the teams were not paid. This decision was coordinated by Mckenzie Beverage, the SSC Program Advisor, during FY12 and FY13.
Attached Files: