Note - The Foreign Language Building (FLB) has been renamed to Literatures, Cultures and Linguistics Building (LCLB).
Green roof trees are scheduled to be installed in the spring of 2024.
Note - The Foreign Language Building (FLB) has been renamed to Literatures, Cultures and Linguistics Building (LCLB).
Green roof trees are scheduled to be installed in the spring of 2024.
The Land & Water iCAP team met on Teams from 1-2 PM on Friday, October 6th.
The LCLB basement roof is a plaza at ground level. It was built to accommodate greenery on the roof and did so from 2012 to 2014. The planters were filled with porous rock for ease of maintenance. The area still helps with rainwater runoff, however, plants could be added to the planters again to provide more benefits around the ground level of the building. Plants were added on 6/18/24.
No description has been provided yet.
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Project details last updated on: 6/20/2024. Check Project Updates for recent activity.