The Energy Team had their March meeting on Thursday, March 6th, from 2:00 - 3:00 PM. We welcomed a new member and had a hybrid meeting. The focus was on the Building Occupancy Engagement Pilot Program.
You are here
Rooftop Solar Potential (Completed)
Recent Project Updates
-
3/5/2025
-
2/6/2025
The Energy Team had their February meeting on Thursday, Feb. 6th, from 2:00 - 3:00 PM. We discussed updates on the solar rooftop project, focusing on the Krannert Art Museum as a potential installation site.
Project Family
-
Solar Power on Campus
- Agrivoltaic Research Solar Array at Energy Farm
- BIF Rooftop Solar PVs
- CABBI Greenhouse Solar Array
- E37 Parking Lot Solar Lighting
- ECE Rooftop Solar PVs
- Ground Mounted Solar PVs BRC Research Test Bed [ARCHIVED]
- InSPIRE Solar Powered Outdoors Table (SPOT)
- Install Solar PVs on NCPD
- KCPA Rooftop Solar Feasibility Study [ARCHIVED]
- Rooftop Solar Potential
- SSC Solar Feasibility Study [ARCHIVED]
- Solar Farm 1.0
- Solar Farm 2.0
- Solar PVs at Idea Garden
- Solar PVs on Fruit Farm Admin Building [ARCHIVED]
- Solar PVs on I Hotel and Conference Center
- Solar PVs on President's Garden Shed
- Solar Panels on Everitt Lab [ARCHIVED]
- Solar at Willard Airport
- Speech and Hearing Rooftop Solar PVs
- Uni High Gym Rooftop Solar PVs
- Vertical Solar Panels on MEB
- Wassaja Hall Rooftop Solar PVs
Associated Collections
Associated Recommendation(s)
Project Location(s)
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.