F&S completed the renewal of our recognition as a Green Power Partner through the US Environmental Protection Agency. Green Power Partners of our scale now have to use renewable power for seven percent of their annual consumption.
You are here
Wassaja Hall Rooftop Solar PVs (Completed)
Recent Project Updates
Project Family
-
Solar Power on Campus
- Agrivoltaic Research Solar Array at Energy Farm
- BIF Rooftop Solar PVs
- E37 Parking Lot Solar Lighting
- ECE Rooftop Solar PVs
- Ground Mounted Solar PVs BRC Research Test Bed
- InSPIRE Solar Powered Outdoors Table (SPOT)
- Install Solar PVs on NCPD
- KCPA Rooftop Solar Feasibility Study
- Rooftop Solar Potential
- SSC Solar Feasibility Study
- Solar Farm 1.0
- Solar Farm 2.0
- Solar PVs at Idea Garden
- Solar PVs on Fruit Farm Admin Building
- Solar PVs on I Hotel and Conference Center
- Solar PVs on President's Garden Shed
- Solar Panels on Everitt Lab
- Solar at Willard Airport
- Speech and Hearing Rooftop Solar PVs
- Uni High Gym Rooftop Solar PVs
- Wassaja Hall Rooftop Solar PVs
Associated Collections
Description
Solar Generation from Wassaja Hall
Annotations
- FY 2016:
estimated, this was a partial year
- FY 2017:
estimated for July to October
Project Team
-
Project Leader:
John Humlicek
Themes
-
Primary Theme:
Project Location(s)
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.