FY13 RCx (Completed)

Description

In FY13, Retrocommissioning was completed in three buildings.

Background

Medical Sciences Building

Two of the AHUs have two wheels each, an enthalpy wheel and a sensible wheel with the heating and cooling coils between. Much careful engineering analysis and consulting with vendors and the original design engineer was required to optimize the energy wheels with the coils....View full background »

Conclusion

  • Medical Sciences Building, 25% savings
  • Institute for Genomic Biology, 25% savings
  • Huff Hall, 25% savings

No description has been provided yet.

Project Team

  • Project Leader:

    Karl Helmink

Themes