You are here

Project Updates for collection: Student Sustainability Committee Funded Projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. EGEN SWATeam Meeting (3.10.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Associate Director for Campus Sustainability Ximing Cai and his vision for iSEE
    • Biomass boiler at Energy Farm
    • Opportunities for Geothermal on campus
  2. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Comments needed on Illini Lights Out (ILO) recommendation;

    2) Illini Lights Out final planning for 10th of March;

    3) Building level energy consumption report;

    4) Participation in Earth Hour and Earth week activities on campus;

    5) Updates on the Green Labs Coordinator;

    6) Planning for a campus walk focused on space utilization.

     

  3. iWG Meeting Notes from Jan. 27, 2017

    The iCAP Working Group met and discussed the following agenda items.  Meeting notes are attached.

    1. Brief iCAP Portal overview by Morgan
    2. Discuss any updates to Water002, Cooling Tower Increase COC
    3. Discuss Trans008, Bike Parking in Ramps
    4. Discuss updates to Econs004, Green Labs Coordinator
    5. Consider issues with recommendation process and view recommendation tracker

    Attached Files: 
  4. Work Order created for engineering work

    Associated Project(s): 

    Work Request 253325 converted to Work Order 10519389

     

    Work Order: 10519389

    Building: 0209 - SPEECH AND HEARING SCIENCE

    Room:

    Department Reference:

     

    Customer Description:

    WO for engineering services for solar funding for Speech and hearing sciences

     

    Phases:

    Phase: 001 DESIGN SERVICES

  5. Weekly Update

    Associated Project(s): 

    All, last week we had 114 visitors. We grossed $997.25. We sold two bikes for $210 and six memberships for $180. The new hires are coming along, with only minor hiccups here and there.

    Last week Lily and I assisted with the University High School Agora Days class that a Bike Project member was leading.  For Four days last week we went over various bike repair basics, focusing on tires/tubes, minor brake adjustments, chains, and a how-to on bike fitting. The kids were genuinely interested and engaged, and no one minded getting a little dirty. The only downside was the one-hour limit on each day’s class.

    Lily and I also met to discuss the implementation of some bike classes for which she so adeptly secured funding.

    This week I will get a job posting up for more student workers, as one new hire is MIA and a few others are graduating. I will continue to work on the departmental bike share bikes for F&S as well as bikes for sale here, as our stock isn’t quite as robust as I would like pre-spring rush.

    Sincerely,

    • Jake Benjamin
      Campus Bike Center Manager
  6. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Discuss and comment on attached recommendation for institutionalizing Illini Lights Out;

    2) Illini Lights Out final planning for 24th of February;

    3) Participation in Earth Hour activities on campus;

    4) Discussion on what else to accomplish this year.

  7. PWR SWATeam Minutes

    At the PWR SWATeam meeting on Feb. 22nd, the team discussed the current campus paper policy. The team will work on reviewing and improving the paper policy to ensure all departments are meeting standards for recycled paper content and identifying reasons for lack of participation. 

    Attached Files: 
  8. Meeting to initiate the work order

    Associated Project(s): 

    F&S staff met to discuss the Speech and Hearing Sciences Building Rooftop Solar PVs project.  Managing Engineer Kristine Chalifoux and Electrical Engineer Brian Finet will take the lead on the design.  The design will use a ballast mounting system, real time energy meters, and an online solar dashboard.

  9. Weekly Update

    Associated Project(s): 

    All, last week we grossed $506.80. We sold one build-a-bike for $35 and two memberships for $60. We had 60 visitors to the shop.

    We were inundated this past week with volunteers, which isn’t a bad thing but is difficult to come up with enough unskilled jobs in a very skill-demanding environment. Thankfully, the organizing never ends! I made some good progress on the wheel storage rack in the back corner of the CBC and it will be completed by the end of the day today. While not the best built thing out there, it will get the job done and allow us to store more wheels safely out of the way and off the ground.

    This week will be truncated since I was sick over the weekend and did not work on Monday or Tuesday. But good news: Lily has secured funding for some basic maintenance classes for the spring! Way to go Lily! I will meet with her next week and discuss the details. This week I will start recruiting again for more hires since four of the current CBC staff are graduating in May and at least one more will not be around to help in the summer.

    Sincerely,

    • Jake Benjamin
      Campus Bike Center Manager
  10. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Discussion of recommendation process as developed and described in the iCAP;

    2) Illini Lights Out final planning for 10th of February;

    3) Update on fume hood work;

    4) North America Laboratory Freezer Challenge update;   5) Planning for Earth Week.        

     

     

     

     

     

  11. Pipette Tip Recycling at Vet Med

    The Veterinary Diagnostic Lab (VDL) at the College of Veterinary Medicine (CVM) functions similar to a human medical institution, in that it generates waste that is not recyclable due to biosafety considerations. This is an unfortunate waste. This project seeks to begin recycling some of VDL’s plastics. This project’s goal is to capture the waste from their work that involves single use sterile pipette tip boxes, which are safe to be recycled. The VDL typically disposes of 12lbs a week of clean plastics in the form of pipette tip boxes; VDL operates 52 weeks a year, generating over 600lbs a year of recyclable plastics. With funding from the SSC, VDL can take 600lbs of plastic out of the waste stream using a clean pipette tip recycling program.  http://ssc.sustainability.illinois.edu/?p=1446

  12. special vote requested

    Revolving Loan Fund Selection Committee,

    The time is almost here to select another round of projects for the Revolving Loan Fund. For this upcoming selection we have approximately $1,000,000 to allocate. However, due to a timing issue I am appealing to the committee to decide on a Retro-Commissioning project in advance of the formal selection meeting. The reason for requesting Retro-Commissioning at Memorial Stadium early is due to a deadline associated with the availability of DCEO grant dollars. If expenditures and savings are realized prior to May 31, 2017, DIA could receive $100,000 in grant money from DCEO. Our meeting for project selection is targeted for the first week of May 2017 which does not give us enough time to qualify for the grant.

    Below is project specific information that would normally be presented at the project selection meeting. We don’t necessarily need to score this project, all we need is a majority decision (yes or no) to approve this project. If accepted, the committee would be considering $800,000 for allocation at the targeted May selection meeting.

    Project Name: Memorial Stadium Retro-Commissioning

    Project type: Retro-Commissioning

    Buildings: Memorial Stadium

    Energy Cost Savings: $300,000 /year

    Funding Request: $200,000

    Project Cost: $500,000 (DIA will contribute $200,000 and DCEO grant contribution will be $100,000)

    Payback Period: Approximately 2 Years

    General Description of Work:

    Provide temperature control upgrades & retro-commissioning services for the west and north portions of the stadium. During preliminary work, many noteworthy items have been identified. Several HVAC equipment scheduling improvements have been made already.

    Project Owners: Brett Stillwell (Athletics) / Karl Helmink (F&S)

    Project Execution Contact: Brett Stillwell (Athletics) / Karl Helmink (F&S)

    Criteria:

    1-      Payback Period: The payback period is approximately 2 years.

    2-      Reduction of Greenhouse Gas: Greenhouse gases will be reduced by 3,491,227 lbs due to conservation of electricity, chilled water, and steam.

    3-      Fund Size Impact: While grant dollars are available for this particular submission, the grant will not be used to increase the Revolving Loan Fund balance.

    4-      Visibility: Memorial Stadium is an iconic building for Athletics on campus.  The energy savings could be indirectly visible in that it could pay for other items that Athletics desires. There is a large amount of diversity in the usage of the space.

    5-      Project Coordination: Coordination items need to be considered as the south end zone & east grandstand project approaches. There are temporary plans to be considered prior to the arrival of this particular project.

    Other Pertinent Information:

    It is proposed that Athletics provide $200k for this project. Eileen Westervelt, via DCEO funding, has provided a building energy study which has identified large energy savings in this building of over $300,000 per year. It is suggested that to secure the $100K DCEO grant, $150K needs to be spent by May 31, 2017 and evidence will need to be presented that the indicated energy is being saved.

    The campus has realized a significant amount of utility savings due to the efforts made by the Retro-Commissioning teams and the expectation would be no different at Memorial Stadium. The data the Retro-Commissioning group has provided for this application predicts a very positive outcome which is consistent with most of their projects throughout campus.

    The reason for the expedited decision is to take advantage of the possible DCEO funds that will likely not be available in the future. Thanks again for your participation in this selection process and please let me know if you have any questions or concerns.

    I ask that you please reply with your individual yes or no votes before February 10, 2017.

    Thanks again,

    Josh Whitson

  13. Weekly Update

    Associated Project(s): 

    Hello, this past week saw 57 visitors come to the Campus Bike Center. We grossed $381 even. We sold one build-a-bike for $87, zero refurbished bikes, and one membership ($30).

    This past week also saw two new staffers start: Leah and Angelica. They are both capable, helpful, and welcome additions to the staff. This week David (and hopefully Zack) will start, rounding out this semesters’ staffers. I reconfigured the cone wrench station, which is now much easier to use and keep clean and efficient.

    For the upcoming week I will be contacting surplus about some furnishings, ramping up the for-sale bike quota, training new staff, and beginning to construct the wheel storage rack that I could not get to last week.

    Sincerely,

    • Jake Benjamin
      Campus Bike Center Manager
  14. PWR SWATeam Minutes 2/3/2017

    At the PWR SWATeam meeting on Feb. 3, the team reviewed the status of the Illini Gadget Garage.  It is going very well, and they have hired students to help promote and market the open hours. The team also discussed the proposed recycled-content paper policy.  This policy was not approved at the System level, and UI at Chicago is working to implement their own policy for their campus.  UIUC can do the same, through an update to the existing policy.  Morgan will bring the policy to the next SWATeam meeting for discussion.  Morgan also asked about the SWATeam recommendation process and invited team members to send her comments and suggestions.  The Chair was selected as Fanxing Liu, with plenty of help from iSEE and the SWATeam Clerk, Meghan Killinger, because Fanxing just joined the team.

    Attached Files: 

Pages