You are here
Project Updates for collection: Student Sustainability Committee Funded Projects
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):Attached Files:
PWR SWATeam Minutes 3/15
Associated Project(s):At the PWR SWAT Team meeting on March 15th, the team debated over the message in the new Ethics Compliance Message concerning recycling standards and rules. The team decided that two videos should be created, one with base instructions for recycling, the other for explaining the commonly misunderstood paper policy. The team will look more into the paper policy draft and suggest a new paper policy for the campus.
Attached Files:Plans for wrapping up student project
Associated Project(s):Diliya Murtazina and Morgan Johnston reviewed the work tasks completed this year, and identified files to finalize for the end of this project. Diliya will formalize the behavior change strategies document, collect all the example images, and provide documentation on the creation of the building level energy charts with examples.
Weekly Update
Associated Project(s):All, Happy Monday! Last week was a steady busy one. We routinely had peaks of busyness and fallow valleys. We had 97 visitors through the doors, including staff. We grossed $951.50. We sold two bikes for $335; one build-a-bike for $61; and 4 memberships for $120.
Overall, last week I was met with a little more enthusiasm for the space than I regularly receive upon explaining the cost structure and mission of the CBC to new visitors. That was nice. Our for-sale bike count after last week sits at 14 for-sale bikes. I keep trying to grow that number up into the 20s but people keep buying them. That’s not a bad thing, I suppose.
Additionally, the two Departmental Share bikes need parts that are on-order so that project will be delayed, unfortunately.
Our numbers for B-a-Bs last year was quite low and as such I will begin photographing—with permission—all those who complete build-a-bikes and posting them on social media, which will serve two important functions: advertising for CBC and its most education-intensive program; and having a picture of owner and bicycle in the event of a stolen or lost bike.
This week I am going to cull a few more unbuiildable bikes from the pile and concentrate heavily on ramping up the for-sale numbers since this week of cold, snowy weather should keep the shoppers at bay. I will additionally focus on drop-bar bicycles, since I’ve noticed people requesting and looking for those more than the about-town cruisers and flat-bar bikes we have for sale, irrespective of how well-suited they are to campus riding.Sincerely,
Jake Benjamin
Campus Bike Center Manager
New Zero Waste Coordinator started work
Associated Project(s):The new Zero Waste Coordinator started work on March 13.
EGEN SWATeam Meeting (3.10.17)
Associated Project(s):The EGEN SWATeam held another bi-weekly meeting. Topics covered include:
- Associate Director for Campus Sustainability Ximing Cai and his vision for iSEE
- Biomass boiler at Energy Farm
- Opportunities for Geothermal on campus
Attached Files:ECBS SWATeam meeting minutes
Associated Project(s):On the agenda at the ECBS SWATeam meeting:
1) Comments needed on Illini Lights Out (ILO) recommendation;
2) Illini Lights Out final planning for 10th of March;
3) Building level energy consumption report;
4) Participation in Earth Hour and Earth week activities on campus;
5) Updates on the Green Labs Coordinator;
6) Planning for a campus walk focused on space utilization.
Attached Files:iWG Meeting Notes from Jan. 27, 2017
Associated Project(s):The iCAP Working Group met and discussed the following agenda items. Meeting notes are attached.
1. Brief iCAP Portal overview by Morgan
2. Discuss any updates to Water002, Cooling Tower Increase COC
3. Discuss Trans008, Bike Parking in Ramps
4. Discuss updates to Econs004, Green Labs Coordinator
5. Consider issues with recommendation process and view recommendation trackerAttached Files:Work Order created for engineering work
Associated Project(s):Work Request 253325 converted to Work Order 10519389
Work Order: 10519389
Building: 0209 - SPEECH AND HEARING SCIENCE
Room:
Department Reference:
Customer Description:
WO for engineering services for solar funding for Speech and hearing sciences
Phases:
Phase: 001 DESIGN SERVICES
Weekly Update
Associated Project(s):All, last week we had 114 visitors. We grossed $997.25. We sold two bikes for $210 and six memberships for $180. The new hires are coming along, with only minor hiccups here and there.
Last week Lily and I assisted with the University High School Agora Days class that a Bike Project member was leading. For Four days last week we went over various bike repair basics, focusing on tires/tubes, minor brake adjustments, chains, and a how-to on bike fitting. The kids were genuinely interested and engaged, and no one minded getting a little dirty. The only downside was the one-hour limit on each day’s class.
Lily and I also met to discuss the implementation of some bike classes for which she so adeptly secured funding.This week I will get a job posting up for more student workers, as one new hire is MIA and a few others are graduating. I will continue to work on the departmental bike share bikes for F&S as well as bikes for sale here, as our stock isn’t quite as robust as I would like pre-spring rush.
Sincerely,
- Jake Benjamin
Campus Bike Center Manager
- Jake Benjamin
ECBS SWATeam meeting minutes
Associated Project(s):On the agenda at the ECBS SWATeam meeting:
1) Discuss and comment on attached recommendation for institutionalizing Illini Lights Out;
2) Illini Lights Out final planning for 24th of February;
3) Participation in Earth Hour activities on campus;
4) Discussion on what else to accomplish this year.
Attached Files:Water & Stormwater SWAT Meeting Minutes 2/23/2017
Associated Project(s):Updates on BIF Greywater Meter, Increase Cooling Tower COC, and Design Center Greywater Piping recommendations. Discussion on the development of water use dashboard.
Attached Files:iWG meeting agenda February 23, 2017
Associated Project(s):see file
Attached Files:iWG meeting minutes February 23, 2017
Associated Project(s):see file
Attached Files:PWR SWATeam Minutes
Associated Project(s):At the PWR SWATeam meeting on Feb. 22nd, the team discussed the current campus paper policy. The team will work on reviewing and improving the paper policy to ensure all departments are meeting standards for recycled paper content and identifying reasons for lack of participation.
Attached Files:EGEN SWATeam Meeting (2.17.17)
Associated Project(s):The EGEN SWATeam held another bi-weekly meeting. Topics covered include:
- Updating the EGEN objectives project page
- Reporting steam generation on-campus
- Plans for this semester
Attached Files:Meeting to initiate the work order
Associated Project(s):F&S staff met to discuss the Speech and Hearing Sciences Building Rooftop Solar PVs project. Managing Engineer Kristine Chalifoux and Electrical Engineer Brian Finet will take the lead on the design. The design will use a ballast mounting system, real time energy meters, and an online solar dashboard.
Weekly Update
Associated Project(s):All, last week we grossed $506.80. We sold one build-a-bike for $35 and two memberships for $60. We had 60 visitors to the shop.
We were inundated this past week with volunteers, which isn’t a bad thing but is difficult to come up with enough unskilled jobs in a very skill-demanding environment. Thankfully, the organizing never ends! I made some good progress on the wheel storage rack in the back corner of the CBC and it will be completed by the end of the day today. While not the best built thing out there, it will get the job done and allow us to store more wheels safely out of the way and off the ground.
This week will be truncated since I was sick over the weekend and did not work on Monday or Tuesday. But good news: Lily has secured funding for some basic maintenance classes for the spring! Way to go Lily! I will meet with her next week and discuss the details. This week I will start recruiting again for more hires since four of the current CBC staff are graduating in May and at least one more will not be around to help in the summer.Sincerely,
- Jake Benjamin
Campus Bike Center Manager
- Jake Benjamin
ECBS SWATeam meeting minutes
Associated Project(s):On the agenda at the ECBS SWATeam meeting:
1) Discussion of recommendation process as developed and described in the iCAP;
2) Illini Lights Out final planning for 10th of February;
3) Update on fume hood work;
4) North America Laboratory Freezer Challenge update; 5) Planning for Earth Week.
Attached Files:Pipette Tip Recycling at Vet Med
Associated Project(s):The Veterinary Diagnostic Lab (VDL) at the College of Veterinary Medicine (CVM) functions similar to a human medical institution, in that it generates waste that is not recyclable due to biosafety considerations. This is an unfortunate waste. This project seeks to begin recycling some of VDL’s plastics. This project’s goal is to capture the waste from their work that involves single use sterile pipette tip boxes, which are safe to be recycled. The VDL typically disposes of 12lbs a week of clean plastics in the form of pipette tip boxes; VDL operates 52 weeks a year, generating over 600lbs a year of recyclable plastics. With funding from the SSC, VDL can take 600lbs of plastic out of the waste stream using a clean pipette tip recycling program. http://ssc.sustainability.illinois.edu/?p=1446