You are here
Project Updates for collection: Bicycle Related Projects
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
New 70 4-loop and 60 5-loop rail-mounted bike racks have arrived!
Associated Project(s):The University requested bids from vendors in FY15 for the purchase of 70 4-loop and 60 5-loop bike racks. RJ Thomas Manufacturing Co. Inc. were one of those who responded to this bid. The University received these new 70 4-loop and 60 5-loop bike racks from this vendor in Spring 2015.
Previous description in iCAP Portal - paragraph removed
Associated Project(s):Administrative Information Technology Services (AITS) has played a large role in leading this discussion and is working with Facilities & Services to try to implement a bike share program before Fall 2014. AITS hopes to partner with other departments on campus to create a cohesive and connected bike share system within the University.
Campus Bike Plan - APPROVED!
Associated Project(s):On March 3, 2015, the Chancellor's Capital Review Committee formally approved the 2014 Campus Bike Plan for inclusion in the official Master Planning documents.
Attached Files:Previous description in iCAP Portal
Associated Project(s):Transportation Demand Management (TDM) in Facilities & Services is finalizing the 2014 Campus Bike Plan, a master plan to direct our efforts for future bicycle infrastructure improvements and program development. The official public comment period for the Campus Bike Plan ended in April 2013, but additional feedback is always welcome via the online bicycle feedback form.
The draft 2014 Campus Bike Plan was available for public input during a four-week period, and members of the campus community were encouraged to review the plan and submit their comments and feedback via the online Campus Bicycle Feedback Form.
- Download Campus Bike Plan (PDF) (updated July 2014)
- Submit feedback through the Campus Bicycle Feedback Form
bike racks shipped!!
Associated Project(s):A large quantity of bike racks (U-loops) were shipped to campus on Monday. These are part of the SSC funded bike parking upgrades. They will be installed when the weather allows.
Safety "Zine" idea
Associated Project(s):I have been working with Jeff and there were two things we thought would be a good use of resources. The first is a safety booklet. It would be modeled after a "zine" which is a DIY publication that is popular with young people.We were thinking it would be cool to have the same guy who did last year's Bike Month t-shirt illustrate the zine with content we provided. - James Roedl
Traffic Skills 101 course
Associated Project(s):The second idea we wanted to pursue was putting on the TS 101 courses. The normal cost that Cynthia charges is $65 per person. We thought we could contract with CCB $400 or $500 to do a full day lunch provided TS101 training for 10-15 people. It would be offered to students and staff who wanted to learn more about safety and promised to be a safety advocate. This would save money over the total cost of training and allow a larger group of folks receive serious safety training. - James Roedl
update from Ben McCall
Associated Project(s):Dear Transportation SWATeam,
Morgan and I had a very nice discussion with Pam Voitik at F&S late last week, and I wanted to brief you on some of the key points as they relate to the iCAP revisions.
1) F&S is in favor of hiring a full-time "Active Transportation Coordinator," and having that person report to the Transportation Demand Management Coordinator (Stacey DeLorenzo). "Active Transportation" (as you probably all know, but I didn't!) is industry lingo for all transportation except single-occupancy-vehicles. So this person would be responsible for mode shift, the Bike Plan, and so forth...basically the last two bullet points in item #6 on page 30 of the current draft.
2) Pete Varney and his team would be the sensible locus for efforts related to shifting the fleet more towards EVs and bicycles, and exploring renewable fuels for the fleet. [The second and third bullet points in item #6 on page 30.]
3) The first bullet point, about air travel, is outside of the scope of F&S, and should perhaps be a focus of iSEE or another entity in the domain of the Chancellor or Vice Chancellors.
4) The Campus Bicycle Plan is essentially finalized now, but F&S is working on ascertaining exactly what entity should formally approve it.
Pam's suggestion is that it should be approved by the campus leadership (rather than by F&S), but the responsibility for implementing it should be with F&S. This would give the Plan more authority/heft than if it were approved by F&S alone. There is reason to hope that this approval will be finalized before the iCAP.
Cheers,
Ben
Working Bikes donation
Associated Project(s):Michelle,
This Saturday we removed 390 bicycles from the warehouse. Of the bikes we planned to ship to Ghana 60 or 70 did not fit into the shipping container. I am arranging for Working Bikes to come down in a few weeks and pick these up. I do not have a date yet. I will let you know as soon as I can confirm details. There are also about 60 good bikes that I will transfer from the warehouse to the bike center. I will work with Tina and the other parking employees to get this done.
Thanks,
James Roedl
Bike Fix-It Stations
Associated Project(s):Stacey,
The air pumps are installed at both locations. I have attached a picture
JamesAttached Files:Step 1 Proposal Received
Associated Project(s):Japan House and the University of Illinois Arboretum request funding to provide bike racks. Although the Arboretum and Japan House are administered separately (Japan House through the College of Fine and Applied Arts, and the Arboretum through ACES, Japan House sits within the Arboretum and the two units often collaborate on projects. There are currently no available bike racks in the 57-acre Arboretum and Japan House grounds. Japan House is the site of University classes and the Arboretum is frequently used as a resource for classes from units such as Landscape Architecture, Crops Sciences, Natural Resources and Environmental Sciences and others. In addition, the Arboretum and the Japan House Gardens are a major recreational resource for Illinois students, faculty and staff, and yet currently, there is no bike parking or encouragement for students, faculty and staff to bike to reach these grounds. Currently, bikers are forced to lock bikes to benches, lampposts, trees, and other structures inappropriate for this use and sometimes permanently damaging to the trees or structures. The Japan House offices are located at the site and students routinely ask where they should lock up their bikes. Funding is requested for the installation of two six-loop bike racks mounted on sufficient permeable pavement for easy access and grounds maintenance and relating biking policy signage.
Attached Files:on campus distribution locations
Associated Project(s):Champaign-Urbana Area Bicycle Map
Distribution Locations on the Illinois CampusUniversity Locations
Campus Parking:
Public Safety Building, MC-241
1110 Springfield Ave., Suite 201
Urbana, IL 61801Campus Police:
Safety Day
September 11, 2008Campus Recreation
Campus Recreation Center East
Activities Recreation CenterMcKinley Health Center
1109 S. Lincoln Ave.
Urbana, IL 61801Illini Union Bookstore
809 S. Wright Street
Champaign, IL 61820Undergraduate Library
1402 West Gregory
Urbana, IL 61801Illini Union
1401 West Greet Street
Urbana, IL 61801International Student and Scholar Services
400 Student Services Building
610 E. John
Champaign, ILTurner Student Services
Front Desk or Third Floor (Dean of Students)
610 East John
Champaign, IL 61801Alice Campbell Alumni Center
601 South Lincoln Ave.
Urbana, IL 61801University Housing
Allen Hall front desk
1005 W. Gregory Drive
Urbana, IL 61801Busey/Evans Hall front desk
111 W. Nevada Street
Urbana, IL 61801Townsend Hall front desk
918 West Illinois St.
Urbana, IL 61801Wardell Hall front desk
1012 West Illinois St.
Urbana, IL 61801Trelease Hall front desk
901 College Ct.
Urbana, IL 61801Oblesby Hall front desk
1005 College Ct.
Urbana, IL 61801Babcock-Carr Hall front desk
1001 W. Pennsylvania Ave.
Urbana, IL 61801Blaisdell-Sunders Hall front desk
901 W. Pennsylvania Ave.
Urbana, IL 61801Weston Hall front desk
204 E. Peabody Drive
Champaign, IL 61820Taft-Van Doren Hall front desk
1213 South Fourth Street
Champaign, IL 61820Barton and Lundgren Halls front desk
1205 South Fourth Street
Champaign, IL 61820Forbes Hall front desk
101 East Gregory Drive
Champaign, IL 61820Garner Hall front desk
201 East Gregory Drive
Champaign, IL 61820Hopkins Hal front desk
103 East Gregory Drive
Urbana, IL 61801Orchard Downs front desk (Family and Graduate Housing)
1841 Orchard Place
Urbana, IL 61801Sherman Hall front desk
909 South Fifth Street
Champaign, Il 61820Daniels Hall front desk
1010 West Green Street
Champaign, IL 61820Private Certified Housing
Armory House
1010 South Second
Champaign, IL 61820Bromley Hall
910 South Third
Champaign, IL 61820Europa House
802 West Oregon
Urbana, IL 61820Illini Tower
409 East Chalmers
Champaign, IL 61820Newman Center
604 East Armory Ave.
Champaign, IL 61820Presby Hall
405 East John
Champaign, IL 61820Cultural Houses
Asian American Cultural Center
1210 West Nevada Street
Urbana, IL 61801Bruce D. Nesbitt African American Cultural Center
708 South Mathews
Urbana, IL 61801Press Release - 2014 Bike Map released
Associated Project(s):Champaign County Bikes (CCB) announces “Go by Bike”, the latest version of its Champaign-Urbana-Savoy Bicycle Guide and Map. CCB will begin making it available through local bicycle shops, City and Park District offices, and public libraries. In addition, the map will be distributed by the University of Illinois to students, faculty and staff as well as at CU-MTD’s Illinois Terminal. The map will also be available at Urbana’s Market at the Square, Sat., Sept. 27, from 7am - 12pm.
Attached Files:New Bike Code released
Associated Project(s):August 31, 2014
The University Bicycle Ordinance, also referred to as the University Bicycle Code, was updated for campus-specific rules such as bicycle parking and registration, as well as riding bicycles on campus property. Increased enforcement of the code started this semester. This ordinance is included in the Campus Administrative Manual (VIII-22).
Stacey DeLorenzo • Facilities & Services
Bike Code approved
Associated Project(s):The University Bicycle Ordinance, referenced in CAM VIII-22. Bicycle Regulations, was approved by the CAM committee on May 15, 2014. The plan was to have enforcement of the ordinance to begin at the start of the Fall 2014 semester. During the fall semester, enforcement would be focused on education, with only safety-related citations being issued.
The link below is the approved version of the ordinance.
Champaign County Greenways and Trails Plan completed
Associated Project(s):Active Choices: the Champaign County Greenways & Trails (GT) Plan has been finalized, and can be found on the CCRPC website here: http://www.ccrpc.org/greenways/documents.php.
Links are currently posted on the CCRPC and CUUATS Homepages, and can always be found on the GT Homepage.
Allerton Park Bike Share
Associated Project(s):Allerton Park is a valuable but underutilized property owned by the University of Illinois. The Allerton Park Bike Share project intends to improve Allerton Park and make it more attractive to the campus population and the community at large through the installation of a bike share system. In addition to providing an attractive service for visitors, this project will also help promote green transportation when traveling around the 1,517 acre estate.
Sheltered Bicycle Parking
Associated Project(s):Providing safe and convenient locations for bicycle parking is one of the key ways the University can support increased bicycle ridership and greener commuting. The goal of this project is to construct a secure, sheltered bicycle parking area for students, faculty, and staff at the Chemical and Life Sciences Building and the Roger Adams Laboratory. These parking structures are modeled after the sheltered bicycle parking currently located at the Ikenberry Commons.
Attached Files:Sheltered Bicycle Parking Signed Letter.pdf
Sheltered Bicycle Parking for Chemical and Life Sciences Building and Roger Adams Laboratory.docx
SSC_Application_Sheltered_Bike.xlsx
Cover Letter for Sheltered Bicycle Parking.pdf
Example Models for Sheltered Bicycle Parking.png
Sheltered Bicycle Parking for Chemical Life Sciences Building and Roger Adams Laboratory unsigned letter.docx
ssc step 2 application_4-18.xlsx
Sweedler-bicycle support.pdf
SSC approval of scope/schedule change
Associated Project(s):SSC approved the scope and schedule change for the Campus Bike Center.
Attached Files: