Projects Updates for Occupancy and Daylight Sensors

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. controls on HVAC units - note

    Associated Project(s): 

    I would note that the room level controls at the National Soybean Research Center have been upgraded to DDC in the past year.  We plan to do this in the ACES Library in 2021.  We have invested in Turner Hall w/ control upgrades and RCx work. The Ag Engineering building saw a recent project last year to upgrade to DDC controls and replace VAV boxes.  ~Karl Helmink, F&S RCx, january 2021

  2. FY2020 Project Selection Results for the Revolving Loan Fund

    Attached are the final project selection results for this year's Revolving Loan Fund, via Joshua Whitson. A big thanks to everyone who submitted projects and to those who support the Revolving Loan Fund.

     

     

  3. PWR016 Motion Sensor Lighting - Successful

    Dr. Mohamed Attalla, Executive Director at F&S, responded to Dr. Ximing Cai, iWG Chair, on August 27, 2019 stating, "We will prepare the report as requested."

    See the transmittal of PWR016 Motion Sensor Lighting Recommendation. 

    See the SWATeam Recommendation PWR016 Motion Sensor Lighting here. 

     

  4. PWR016 Motion Sensor Lighting - Transmitted

    Following the completion of iWG assessment for PWR016 Motion Sensor Lighting, the recommendation was transmitted to Dr. Mohamed Attalla, Executive Director of Facilities & Services.

    See iWG Assessment of PWR016 Motion Sensor Lighting attached.  The iWG asks, "Please provide the Zero Waste SWATeam with an overview of the existing occupancy sensor efforts. Please explain the direction of these efforts, reasoning, and status/progress to date."

  5. Meeting Minutes for iWG Meeting July 2, 2019

    These are the meeting minutes of the July 2, 2019 Illinois Climate Action Plan Working Group.  Several SWATeam recommendations were assessed in this meeting.

  6. SSC funds occupancy sensors

    Bevier Hall currently has a number of spaces served by obsolete thermostat controls. While efforts to improve scheduling for heating and cooling have made improvements to energy consumption, the installation of occupancy sensors would improve the efficiency of the HVAC system, reducing energy use without sacrificing user comfort. This funding provides resources to install new occupancy sensors in 25 lab, classroom, and office spaces in Bevier Hall.

  7. FLB Green Lighting Funding Agreement

    Hallways in the Foreign Language Building, especially on the upper floors, may go long periods with no traffic. However, the overhead lighting is always on, which is extremely energy inefficient. This project aims to replace some of the overhead lighting with more energy efficient options and install occupancy sensors to automatically dim the lights when people are not present.

  8. Work order for MSEB occ sensor work

    Associated Project(s): 

    Work Request 141288 converted to Work Order 10288695

    Work Order: 10288695

    Building: 0034 - MATERIALS SCIENCE AND ENG BLDG

    Room:

    Department Reference:

    Customer Description:

    Please provide engineering design services to install lighting occupancy sensors and HVAC occupancy sensors in the Materials Science and Engineering Building (MSEB).  Charge CFOP 1-762417-862004-xxxxxx-198000.

    Phases:

    Phase: 001 DESIGN SERVICES

  9. 2009 Classroom Occupancy Sensor Installation

    Associated Project(s): 

    In 2009, the Student Sustainability Committee awarded $50,000 to Facilities & Services for installation of occupancy sensors to control lights in ten campus buildings: Animal Sciences Laboratory, Architecture Building, Bevier Hall, Chemistry Annex, Huff Hall, Materials Science and Engineering Building, Mumford Hall, Music Building, Noyes Laboratory and Transportation Building. The funds were used to install a total of 230 occupancy sensors in 223 rooms in these ten buildings.

  10. 2008 Classroom Occupancy Sensor Installation

    Associated Project(s): 

    In 2008, the Student Sustainability Committee awarded $20,000 to Facilities & Services for installation of occupancy sensors to control lights in three campus buildings: Loomis Laboratory, Foreign Languages Building, and Armory. Later, the budget was increased to $50,000 and the scope expanded to include seven additional buildings: Davenport Hall, Everitt Electrical Building, English Building, Henry Administration Building, Psychology Laboratory, Mechanical Engineering Building, and Wohlers Hall.

  11. Racquetball Court Energy Reduction Project

    Associated Project(s): 

    Twelve racquetball and three squash courts at the Activities and Recreation Center (ARC) were retrofit with 193 fluorescent and 96 mercury vapor light fixtures. The project was funded by the Student Sustainability Committee through an interest-free loan of $75,000.

    Once the lighting retrofits were completed, occupancy sensors were installed in all 15 courts.

  12. RLF Occupancy Sensors FY12

    Associated Project(s): 

    Ten buildings on the University of Illinois at Urbana-Champaign campus were selected to receive RLF funding for occupancy sensors in FY12. In order from top priority to lowest priority, the buildings that received funding are Gregory Hall, the Foreign Languages Building, the Agriculture Engineering Sciences Building, Newmark Laboratory, the Rehabilitation Education Center, the Education Building, the Law Building, the Water Survey Buildings, Noyes Laboratory, and Freer Hall. The University will now proceed to implementation of occupancy sensors in all of the above buildings.

  13. Campuswide Occupancy Sensors

    In 2008, $50,000 was awarded to Facilities and Services to install occupancy sensors in 272 rooms across 10 highly-visible campus buildings. Where in use, the automatic lighting controls reduce energy usage by 30% (total savings of $11,900/year plus inflation) and greenhouse gas emissions (by 88,000 lbs CO2, 323 lbs of NOx, and 1,079 lbs SOx per year). The sensors are a daily reminder to students, faculty, staff, and visitors of the University of Illinois’ commitment to sustainability.

  14. IUB Retrocommissioning and Occupancy Sensors Loan

    Program Background:

    The Student Sustainability Committee (SSC) is tasked with the allocation of the proceeds of two student environmental fees – the Clean Energy Technology Fee and the Sustainable Campus Environment Fee, to improve the sustainability of our campus. The committee has established a program to make funds available for efficiency projects that will be later returned for reinvestment in future projects.

  15. Occupancy Sensors Funding Agreement

    This proposal looks to install occupancy sensors in classrooms, hallways, restrooms, lounges, and other public areas in twenty heavily used campus buildings, chosen according to the number of student contact hours. This project will reduce energy usage by 30% in affected areas, saving the campus approximately $18,000 per year in energy costs (based on a $0.0689/kWh rate), and reduce emissions by nearly 440,000 lbs of CO2 equivalent. This highly visible effort is expected to increase student and community awareness of the impact of reducing lighting usage.

  16. Occupancy Sensors (Automatic Lighting Controls) Funding Agreement

    The goal of this project is to install lighting sensors in classrooms in several University instructional buildings (e.g. the Armory, the Foreign Language Building and Loomis). The sensors will switch off the lights in these areas, after 30 minutes of inactivity, which will reduce lighting consumption by ~30%. Additionally, having these retrofits take place at the same time as additional lighting upgrades will reduce overall installation costs.