You are here

Project Updates for collection: 2010 iCAP Projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Quick payback projects

    Associated Project(s): 

    At some point in the past, perhaps FY 09, Terry Ruprecht and the Provost’s office worked out an agreement to provide a funding source for “quick payback projects.” This meant that the payback was expected to be quick, typically in the 1-3 year range. This was a onetime funding source.  A variety of projects (10-15) have been brought forward and funded at a value of approximately 1 million dollars. These projects have included lighting retrofits, fume hood removals, chiller control upgrades, adding variable frequency drives (VFDs) to HVAC equipment,  temperature control  upgrades, and hot water control valve replacements. 

  2. James Hoffer, student intern, created building list file

    James provided the attached list of buildings audited by student teams in FY11.  Unfortunately, these audits were rushed and incomplete.  There were many follow up discussions about paying the student teams as originally intended, and in the end the teams were not paid.  This decision was coordinated by Mckenzie Beverage, the SSC Program Advisor, during FY12 and FY13.

    Attached Files: 
  3. BLUE LEED standard info

    Leadership in Energy and Environmental Design (LEEDⓇ) is a green building certification and rating system established by the US Green Business Council which provides a framework for the design and construction of green buildings.  The F&S Planning and Construction Divisions successfully implemented LEEDⓇ Silver standards and practices on all capital construction projects over $5 million. As of January 2011, all new construction will strive for LEED Gold Certification.  Facilities & Services employs 25 LEEDⓇ Accredited Professionals. 

  4. BLUE Sustainable planting info

    Sustainable plants are native species that are resilient to insects and disease.  Once established, they require minimal fertilizer, watering, and upkeep.  The F&S Grounds Department planted 80 native trees last year and more than 2,300 native grasses in the last three years.  Campus locations with native grasses include: Roger Adams Laboratory, the Institute for Genomic Biology, the Agricultural Engineering Building, and the Veterinary Medicine Basic Sciences Building. 

Pages